ML19332B941
| ML19332B941 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/06/1989 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-07, GL-89-7, NUDOCS 8911220080 | |
| Download: ML19332B941 (2) | |
Text
[
t uo g.
ucy Power btauon SNp>ngrort. PA 4077K04
'I November 6, 1989 C,UL,c,o awm5 l
U. S.' Nuclear Regulatory Commission l
-Attn
- Document Control Desk Washington,-DC 20555 i
I
-Reference Beaver Valley Power Station, Unit No. 1 and No. 2 e
i' BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Generic Letter 89-07 i
Gentlement t
" Power Reactor Safeguards Contingency
[
Planning for Surface Vehicle Bombs" requests the modification of i
licensee safeguards contingency procedures to address the possibility l
.of a land vehicle bomb.
As a result of our review of the Generic Letter, we have included in our safeguards contingency planning, actions that could be taken to protect against attempted radiological sabotage involving a land vehicle bomb if such a threat were to materialize.
The contingency actions were developed based on the following
- approach, as recommended by the Generic Letter:
i Safe standoff distances.were determined for vital areas.
A review of site feattires was conducted to determine land vehicle access approach path and distances.
L We identified short range measures which could be implemented within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after notification by the NRC.
1' l-
'The above actions were incorporated into contingency measures L
which are maintained in the Physical Security Plan for Beaver Valley i
Units 1
and 2.
This Physical Security Plan change was submitted on l
October 6, 1989 in accordance with 10 CFR 50.54(p).
l If there are any questions concerning this matter, please contact p
L my office.
Very truly yours, J
b Vice President Nuclear Group 1
L cc:
Mr. J.
Beall, Sr. Resident Inspector Mr. W. T.
Russell, NRC Region I Administrator 8Ej Mr. P. Tam, Sr. Project Manager I
- f 8911220000 891106 l
L l
PDR. ADOCK 05000334 F
pass
v
-l 4:
COMMONWEALTH OF PENNSYLVANIA)
)
SS COUNTY OF BEAVER
)
i l
l h
d4W'M!MAJ
, 1989, On this
')
_ day of 4 26# N 718#1d --.,
a Notary Publ:Ic in and for said before me,
/
' Commonwealth and County, personally appeared J.
D. Sieber, who being duly
- sworn, deposed, and said that (1) he is Vice President of Duquesne Light, -(2) he is duly authorit.ed to execute and file the i
foregoing Subraittal on behalf of said company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.
l l
P t
I k AA)/U,
($84,4 6 v yy Tracey A Baczek,teayPutic Shepngport Doro,BowerCounty iAy Comrnssion Expiw Aug.16,1993 lamber,Pomsyht Awooatonof Notate s
(