Responds to Issue Raised by Eh Trottier During Review of Tech Spec Change Request 88-09, Removal of Rod Sequence Control Sys & Lowering of Rod Worth Minimizer Low Power Setpoint. Revised Procedures Will Be Approved by 891117
ML19332B884
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/14/1989
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911210257
Download: ML19332B884 (2)


Text

-

f r

I t

PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS t

f 955 65 CHESTERBROOK BLVD.

l WAYNE, PA 19087 5691 i

(at si sso-sooo f

November 14, 1989 i

i Docket Hos. 50-277

{

J 50-278 i

License Nos. DPR-44 DPh-56 l

t i

U.S. Nuclear Regulatory Commission i

I ATTN: Document Control Desk Washington, D. C.

20555 i

t

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 i

Technical Specifications Change Request No. 88-09, Dated July 19, 1989

+

i i

Gentlemen:

This letter responds to an issue raised by NRR staff I

member, E. H. Trottier, during his review of Technical Specifications Change Request No. 88-09, " Removal of the Rod Sequence Control System and Lowering of the Rod Worth Minimizer Low l

Power Setpoint."

The issue concerns a difference between existing plant i

procedure requirements and the proposed technical specifications.

The existing procedures AO 62A.1-2 and AO 62A.1-3, require a second licensed operator to verify control rod movement and compliance with the prescribed control rod pattern when bypassing the Rod Worth Minimizer (RWM).

The proposed Technical Specification 3.3.B.3.b.1 l

will allow the use of a second licensed operator or a " technically qualified member of the station staff."

Although plant operation in accordance with the existing procedures would be more conservative and in compliance with the proposed technical specifications, procedures AO 62A.1-2 and AO 62A.1-3 will be revised to stipulate that they cannot be revised to allow use of a " technically qualified member of the station staff" instead of the second licensed operator until a program is established to identify the qualifications used in selection of a GN 0911210257 691114 0

PDR ADOCK 05000277

,i p

PDC

\\

- ~

3

,iDocument C:ntrS1 Deck P g3 2 i

t

" technically qualified member of the station staff."

Our target date for establishing this program is May, 1990.

The revised procedures will be approved for use by November 17, 1989.

If you have any questions regarding this matter, please contact us.

l Very truly yours, (17t Ad G. A. Hunger,b]'r.,/

4 J

Director i

Licensing Section Nuclear Services Depar tment l

cca W. T. Russell, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Mesident Inspector G.

Y. Suh, USNRC Project Manager E. H. Trottier, USNRC, NRR r