Telcon W/Util Re A/E Failure to Install & Fabricate Pipe Supports According to Specs.Investigation Revealed Tube Steel Substituted for Steel Angle Pipe Clamps Broken Away from Supports & Hangers Omitted
ML19332B383
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/12/1980
From: Hunt M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
80-060-03L, 80-60-3L, NUDOCS 8009260648
Download: ML19332B383 (1)


Text

,

~..

~.

IJSNP.0 REGl 3N :~

. ~':.. t. *!TA, G E C 7.i?.

n s#i's"Wf:T8"

.d

  • v FACILITY crand Culf 1 DOCKET 40.

5 0dl_6___, _

DATE 9/12/80 TIME 3:30 n.m.

LIC. OCC. NO.

';UBJECT:

CDR - RCl Pipe Sunoort De.(1.gf3ncies

ESCRIPTION OF OCCURRENCE:

Reactor Controls Inc. (RCl) reported to MP&L's A-E that certain pipe supports were not fabricated and installed in accordance with specifications.

These supports were fabricated on site. 'Ihe following problems were found; tube steel substituted for steel angle, hangers welded to imbeds on 3 sides but the, fouthside extended beyond the imbed, several pipe clamps broken away 1

from the supports and hangers omitted. Corrective action is to be determined after further investigation. Report due 10/13/80.

~.

e STCNATURE ;!. D. Hunt 1