ML19332B383
| ML19332B383 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/12/1980 |
| From: | Hunt M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| References | |
| 80-060-03L, 80-60-3L, NUDOCS 8009260648 | |
| Download: ML19332B383 (1) | |
Text
,
~..
~.
IJSNP.0 REGl 3N :~
. ~':.. t. *!TA, G E C 7.i?.
n s#i's"Wf:T8"
.d
- v FACILITY crand Culf 1 DOCKET 40.
5 0dl_6___, _
DATE 9/12/80 TIME 3:30 n.m.
LIC. OCC. NO.
';UBJECT:
CDR - RCl Pipe Sunoort De.(1.gf3ncies
ESCRIPTION OF OCCURRENCE:
Reactor Controls Inc. (RCl) reported to MP&L's A-E that certain pipe supports were not fabricated and installed in accordance with specifications.
These supports were fabricated on site. 'Ihe following problems were found; tube steel substituted for steel angle, hangers welded to imbeds on 3 sides but the, fouthside extended beyond the imbed, several pipe clamps broken away 1
from the supports and hangers omitted. Corrective action is to be determined after further investigation. Report due 10/13/80.
~.
e STCNATURE ;!. D. Hunt 1
0 h[EICL1L COPY
$0
\\
\\
\\
8009260648
~-
{