't Jg lo-In3
.e w
spi GENERALf
) ELECTRIC
~'
Nuc. EAR ENERGY PRODUCTS DIVISION WILMIP.GTON MANUFACTURING DEPARWENT CASTLE HAYNE ROAD P. O. DOX 780. WILMINGTON, N. C. 28401. (919) 343-5000 June 11, 1980 Director Office of Nuclear Materials Safety & Safeguards U.
S. Nuclear Regulhtory Commission s
Washington, D. C.
20555
,'i f g
e
- c m
Attention:
Mr.
W. T. Crow, Section Leader p~'
W Uranium Processing Licensing Section
~,
Q G
b y$
D[
Dear Sir:
g c,
Reference:
NRC License SNM-1097, Docket #70-1113 Ui
Subject:
APPLICATION AMENDMENT N-8, INTENTION TO CONSTRUCT WAREHOUSE BUILDING With reference to activities authorized by SNM-1097 at the GE fuel fabrication plant in Wilmington, N. C., General Electric Company hereby informs you of the intent to construct a building on the plant site for use as-a warehouse.
Details related to this project are enclosed as an attachment to this letter.
Based upon the information contained in this letter and our telephone conversation on June G, 1980, I assume that no prior authorization by the NRC is required for General Electric to proceed tyith the project as described herein, since there are no radiological or criticality safety implications nor any significant environmental impact associated with the project, and since there are no new activities being undertaken in connection with use of the building.
Pursuant to 10 CFR 170.31, enclosed is a General Electric check for
$150 for processing this amendment request.
General Electric personnel would be pleased to discuss this matter further with you and your staff as you may deem necessary.
M CD g
Very truly yours, c3 DO GENERAL ELECTRIC COMPANY p
$N
)
2 St-g1 j
[
+
v p
, g, W T f ".
//
thur L. Ka an, Manager
'~
g Licensing & Compliance Audits
{s MlC J26 y jb App!! cant....l>fg * * * *** ***s ALK:bmw Checki;c.. d,
Attachments cc:
Document Management Branch
,.mCih Fee Cata EjM7 7/g NSD-L+
Ei>= d Fac..
UDl3 Check Rcc'd..'7./,(fg"5
- _"
- I"d 8 y't%.. '.
" ' " .l.'
16.6d6 7
C 8009193
, fII
(
t
t GENERAL
) ELECTRIC f,
LDirector, ONMSS June 11,.1980 I
Attachment - Page 1-i DETAILS.RELATED TO PLANNED WAREHOUSE BUILDING General Electric Company is planning to construct a warehouse building for use in storage of various shipping containers and supplies at the GE fuel fabrication plant in Wilmington, N. C.
Details related to this planned building are shown below.
- 1) Location 137 feet north of the northeast corner of the fuel manufacturing building as shown in the attached figure
- 2) Dimensions e-Length - 285 feet f
e Width 95 feet e
Height - '30 feet with pitched roof and gabled ends
- 3) Construction e
Pre-engineered structure e
Sheet metal siding e-Steel frame Twenty-two skylight windows in ceiling l-e 4). Foundation Poured concrete slab into four-foot deep excavation 5).U.cc - Gterage'of Empty and/or: full RA-series fuel bundle shipping containers e
e_
Empty and/or-full BU-5 and/or BU-7 shipping containers e
General non-nuclear storage (_e.g.,
empty 5-gallon steel pails, fire _ brick, industrial ~ supplies, etc.)
~
'6)' Radiological-Safety There:willsbe no unencapsulated uranium (or'any other radioactive material) handled in the planned warehouse building.
The building will:be.a non-controlled-area from the uranium processing viewpoint.
4 k!
p.
V..J,.
GENERALhELECTRIC Director, ONMSS June 11, 1980 Attachment - Page.2
.7) Criticality Safety Uranium : fuel will be stored in the new building only within Fissile Class I Uhipping -packages or in the inner metal container of the model RA-series shipping package, as authorized in Section 1.6.2(d) and (c), respectively.
Therefore, -since prior analyses have'shown these configurations to be critically safe as considered under. normal and credible accident conditions of storage as required by the NRC for GE to obtain the above authorizations, no further criticality safety analyses are deemed to be required.
- 8) Environmental-Impact There will be no manufacturing activities performed in this building; in. fact, the building will be used for nothing except storage as described above.
Therefore, there will be no anissions.to the environmental of any sort in connection with use of the building.
-Construct.on of the steel' frame / siding building involves no significant excavation or other construction-related activities.
Therefore, we believe that no further environmental impact-assessment is required because there appears to be no significant environmental impact associated with this project.
e y
L i
o 4
E
GEN ER AL & ELECTRit,
~ '
Director,.ONMSS June 11, 1980 Attachment - Page 3 C}r em
-u
?
- QW NEW STORAGE BUILDlHG IU O
--g g
^[
r s
\\
y laNWaste Treatment Fuel Manufacturing Operation Building g
g p,
p 1
L f-1 r
f j
En rgency Control 7
~1 l SP J
'F
- Center,
I t,
p
-]
g $p mr
_ __ 8 SP l-
$p
)_7 j
lX l
i i"b l.
~~
mk g
Q CD N
' Legend:
(
SP Storace Pad (Typical Nunber and location)
FenceLinef GE-Wilmington Manuf acturing Department NEW WAREHOUSE BUILDING 1
1 A. L. Kaplan
~~
- bmw S.(5.# d!5 O