PM-80-913, Forwards Monthly Operating Rept for Aug 1980
(Redirected from ML19332A867)
| ML19332A867 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19332A760 | List: |
| References | |
| PM-80-913, NUDOCS 8009180498 | |
| Download: ML19332A867 (1) | |
Text
7
~
Georg a Power Company:
Post Office Box 442 Baxley.Georg.s31513 ~
T:legnone 912 367-7781 912 537-9444 Georgia Power Edwin 1. Hatch Nuclear Plant
- tn southem etwtrc system Se p-/
Augu+t 10, 1980 PM-80-913 PLANT E.
I.
HATCH NRC Monthly Operating Report Director O f fice of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached.the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.
~
hi u
44W Manry Manage [r Plant CLC/pebe O
() OW u
(
I8009180 Yk[
.