ML19332A866

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0033/80-07 on 800609-13.Noncompliance Noted: Failure to Implement Weighing,Sampling or Gamma Counting Training Program & Failure to Update Control Limits.Details Withheld (Ref 10CFR2.790)
ML19332A866
Person / Time
Site: 07000033
Issue date: 06/30/1980
From: Holody D, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19332A860 List:
References
70-0033-80-07, 70-33-80-7, NUDOCS 8009180497
Download: ML19332A866 (1)


Text

_

U. S. NUCLEAR REGULAIORY COMMISSION OEEICE OE INSPECIION AND ENE0RCEMENI REGION I Report No.

70-33/80-07 Docket No.

70-33 License No.

SNM-23 Safeguards Group 7

Licensee:

Texas Instruments, Incorporated 34 Forest Street Attleboro, Massachusetts Facility Name:

Texas Instruments Inspection At:

Attleboro, Massachusetts Inspection Conducted:

June 9-13, 1980 Date of Last Material Control and Accounting Inspection:

April 7-10, 1980 Type of Inspection:

Unannounced Material Control & Accounting Inspectors:

0. / MM Or

/90 U. J. Holody, Mathematica] 5tatistician cate date Approved by-12o M w

6-Jo-go H. Joyner,/CFAet / Nuclear Materlaj Control cate J] Support Sec W n, Safeguards Branch Inspection Summary:

Areas inspected:

Measurement and Statistical Controls; Storage and Internal Con-troJ; and 10 and its associated LEID.

The inspection involved 35.5 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC reguirements in the tnree areas examined during the inspection except for the following two items:

1.

The licensee failed to implement the training program for personnel involved in weighing, sampling, or gamma counting. (Infraction) 2.

The licensee failed to update control limits at the required freguency and failed to take appropriate action when apparent out-of-control situations occurred.

(Infraction)

Region I Eorm 166 (August 1979)

--8000180 y

' "M. k 2

]