ML19332A847
| ML19332A847 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/05/1980 |
| From: | Barker D HOUSTON LIGHTING & POWER CO. |
| To: | Hubacek B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-79-03A, IEB-79-3A, ST-HL-AE-508, NUDOCS 8009180473 | |
| Download: ML19332A847 (1) | |
Text
PDR LPDR The Light nic' c"= = '
company n_.,,, u,o,o n_ mm.,mm, n_.,,,.m 7 August 5, 1980 ST-HL-AE-508 SFN: V-0540 Mr. Bill Hubacek Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102
Dear Mr. Hubacek:
South Texas Project Units 1&2 Docket Nos. STN 50-498, STN 50-499 IE Bulletin No.79-03A Houston Lighting & Power Company recently contacted you concerning a clarification of the requirements of NRC IE Bulletin 79-03A, " Longitudinal Weld Defects in ASME SA-312, Type 304 Stainless Steel Pipe."
In evaluating the pioing design stresses to determined those which exceed 85% of the Code allowable stresses, HL&P wishes to limit the evaluation to those calculations only concerned with pressure.
As you indicated in your conversation with Mr.
P. L. Walker of HL&P Licensing, this interpretation is acceptable to the NRC.
Your clarification of this concern is appreciated.
Very truly yours, I
..t~
q q
D. G. Barker, Mdnager South Texas Project PLW/pjb cc:
J. G. White A. J. Granger s S. S. Rodgers9 L. R. Jacobi P. S. Jordan (B&R)
I 8009180 'l 7 3