ML19332A413

From kanterella
Jump to navigation Jump to search
Forwards LER 80-126/03L-0
Date released: 12/12/2019 Download: ML19332A413


LER 80-126/03L-0:on 800824,during Steady State Operation at 1540 MW,2P33-P001A,primary Containment Hydrogen & Oxygen Analyzer Became Inoperable.Caused by Faulty Design of Regent Gas Flowmeter.Design Change Requested
ML19332A414
Person / Time
Site: Hatch 
Issue date: 09/09/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19332A414 (2)
Forwards LER 80-126/03L-0
ML19332A412
Person / Time
Site: Hatch 
Issue date: 09/09/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19332A412 (1)