OPERATING DATA REPORT DOCKET NO. 50-344 DATE 9-7-Rn 1
COMPLETED BY.G 0- Rn4r TELEPHONE 503/556/3713 Ext. 234 OPERATING STATUS Notes
- 1. Unit Name:
Troian Nuclear Plant August 1980
- 2. Reporting Period:
1aT1
- 3. Licensed Thermal Power (MWt):
)
1216
- 4. Nameplate Rating (Gross MWe):
1110 S. Design Electrical Rating (Net MWe):
1122 C. Maximum Dependable Capacity (Gross MWe):
1080
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
~ 9. Power Level To Which Restricted <lf Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
' This Month Yr to.Date Cumulative 744 5855 35063
- 11. Hours in Reporting ?eriod 744 3537.4 19835.4
- 12. Number Of Hours Reactor Was Critical n
n 9171.s
- 13. Reactor Reserve Shutdown Hours 744 3443.2 19071
- 14. Hours Gencrator On-Line 0
0 1508.7
- 15. Unit Reserve Shutdown Hours
?199179 0980127 58875736
- 16. Gross Thermal Energy Generated (MWH) 781140 3214315 19199730
- 17. Gross Electrical Energy Generated (MWH) 7AsssA anaan17 19076as6
- 18. Net Electrical Energy Generated (MWH) 100.0 58.8 54.4
- 19. Unit Service Factor 100 0 58.8 58.7
- 20. Unit Availability Factor 92.8 48.1 47.8
- 21. Unit Capacity Factor (Using MDC Net) 88.7 46.0 45.6
- 22. Unit Capacity Factor (Using DER Net) 0 16.3 28.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
Design modifications from TMI, October 1980, 30 davs NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved NA NA INITIAL CRITICALITY NA NA INITIAL ELECTRICITY COMMERCIAL OPER ATION NA NA 8009100$h
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-144 UNIT Troian DATE 9-2-80 COMPLETED BY G. G.
Bair TELEPHONE 503-556-3713 Ext. 234
~ MONTil Aueuse 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I 1n74 17 1067 2
1076 Ig 1073 3~
In76 19 785 4
1075 20 542 5
In77 21 1064 6
1073 22 1063 7
1060 23 1069 8
1066 24 1068 9
109" 25 1067 10 1041 26 1067 II 774 27 1068 12 432 28 1072 13 404 29 1069 14 467 30 1071 15 1045-31 1068 16 1068 i
INSTRUCTIONS.
On this format. fist the average daily unit power levelin MWe Net for each day in the re;[orting mi
- i. Compute to i
the nearest whole megawatt.
(9/77I
UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.
50--344 UNIT NAME Trainn DATE o ' An COMPLETED BY C-C-
Rair REPORT MONTH Aueust 1980 TELEPHONE sn1/su-1711 Ext. 234
- t.
u e
g
.!E 3.E DgM Event i
Cause & Conective Licensee E*
k H{
7; g No.
Date l
Actism to
@ u?
[U u
$E
- c j f5 g
.Reporia
- Prevent Recurrence d
~
80-07 800811 F
0 A
NA NA NA NA Condenser tube leaks required load reduction from 100% power to 50% to permit entry into the condenser and plugging of "six tiubes.
80-08 800819 F
0 G
NA NA NA NA Reduce load from 100% power to 40%
to plug' additional condenser' tube leaks. Although twenty-three tubes were plugged, the reason for condenser leak indications turned out to be a tube' leak'in the process steam vent condenser in the Process Steam System that allowed service water to be returned to the condenser-as part of process steam boiler condensate.
I 2
3 4-f: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling J Automatic Sc;ain.
Event Report (LERI File (NUREG-D. Regulatory Restriction 40ther(Explain) 0161)
E-operator Training & License Examination F Administrative
.5 G-Opcraiional Error (Explain)
Exhibit I Sanne Simree (9/77) llether (Explain)
- - -