ML19331E423
| ML19331E423 | |
| Person / Time | |
|---|---|
| Issue date: | 08/19/1980 |
| From: | Eadie G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| REF-WM-40 NUDOCS 8009100135 | |
| Download: ML19331E423 (2) | |
Text
ame-bc5 pucrug%
UNITED STATES
+
[
NUCLEAR REGULATORY COMMISSION e E WASHINGTON, D. C. 20555
'J AUG 191980 MEMORANDUM FOR:
Edgemont Remedial Action Program Files (WM-40)
FROM:
Gr.egory G. Eadie Uranium Recovery Licensing Branch
SUBJECT:
MEETING WITH BPNL TO DISCUSS REQUIREMENTS OF REMEDIAL ACTION PROGRAM FOR EDGEMONT, SD ATTENDEES:
.R. A. Scarano - NRC
.G. G. Eadie - NRC
.R. Perkins - BPNL
.N. Wogman~- BPNL
.P. Jackson - BPNL PLACE:
WMUR - Willste Bldg., Silver Spring, MD TIME:
9:00 a.m. to 4:00 p.m. on August 14, 1980 This meeting was held to discuss the program requirements under the S0W
(.B-2217) issued to Battelle Pacific Northwest Laboratories for the remedial action program for Edgemont and vicinity, South Dakota.
The following items were discussed in detail:
1.
Statement of Work (B-2217) work required for each of the four tasks and the overall reporting requirements.
2.
Housing and Urban Development (HUD) requirement and the grab-Working Level protocol.
3.
Engineering Assessment reports such as the ARIX, Inc. reports for 19 structures in Edgemont, SD.
4.
NRC's remedial action program.
5.
Priority listing of 8 structures to be scheduled for remedial 4
action.
The following items were agreed upon at this meeting:
1.
NRC will expedite the issuance of the S0W (B-2217) and funding authorization by August 23, 1980.
2.
BPNL will prepare a draft Form 189 response for the S0W (B-2217) and transmit to NRC for approval by August 27, 1980.
l
.8 0.0.9 1 0 o
.I M
- AUG 191980 6
3.
BPNL will evaluate the HUD grab-WL protocol with respect to air sample volume and filter type to assure reasonable accuracy at the 0.015 WL value. A letter report shall be issued discussing results and conclusions.
4.
BPNL will proceed to develop the written protocols for grab-WL, radiation surveys, and soil sampling and analysis techniques.
5.
BPNL will check into the possibility of initiating sub.-contracts for such tasks as engineering assessments and also the construction /
clean-up remedial engineering work.
NRC will check with TVA and the State r.egardi.ng available construction firms.
6.
BPNL will obtain legal opinion on the need for " release forms" from owner / occupant of residence in order to gain entry to perform radiological surveys, soil sampling, etc.; to perfond e.ngineering assessments; and to perform the actual remedial actions. NRC legal staff will review such BPNL legal documents.
7.
A tentative date of the week of September 8,1980 was set to have BPNL personnel, and mobile laboratory and equipment
~ arrive in Edgemont to initiate the remedial action program.
8.
A tentative date of September 2,1980 was set to have NRC, BPNL and the state meet in Rapid City, SD to discuss the Edgemont remedial action prgoram; to be followed on September 3, 1980 by a " Town Hall Meeting" in Edgemont for the press and general public concerning the remedial action program.
d Gr.egory G. Eadie Uranium Recovery Licensing Branch Division of Waste Management 1
cc:
R. Perkins - BPNL J. Richardson - SD
-