ML19331E273

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Monitoring Rept,Jan-Jun,1980.
ML19331E273
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/29/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19331E274 List:
References
NUDOCS 8009090539
Download: ML19331E273 (1)


Text

u . _ _ _ : . ._ . _ . ____ m_ _

_. _ _. _u I

l -

IMSC0nSin Electnc mia courasr 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE. WI 53201 1

August 29, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555

Dear Mr. Denton:

DOCKET NOS. 50-266 AND 50-301 SEMIANNUAL MONITORING REPORT POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Enclosed herewith is the Semiannual Monitoring Report for the Point Beach Nuclear Plant for the period from January 1 to June 30, 1980.

This report is submitted in accordance with Technical Specification 15.6.9.3.C and contains information regarding plant releases, new fuel i receipts, environmental radiological monitoring and leak testing of sources during the reporting period. Forty copies of this report are being provided to you under separate cover.

Very truly yours, i-- [ '

. '[ [ L 4

-C. W. Fay,' Director l Nuclear Power Department Enclosure Copy to NRC Resident Inspector )

Point Beach Nuclear Plant THIS DOCUMENT CONTAINS i POORjQUALITY PAGES <

foo'I

  1. ~o.. aa s'h

\