Ro:On 800721,during Mode 1 Monthly Functional Testing, Found Seismic Monitoring Sensor ST 6336 in Cable Spreading Room Not Responding Acceptably.Caused by Malfunction of Seismic Triaxial Accelerometer ST 6336.Channel Repaired
ML19331E233
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/28/1980
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To:
References
CPY-830-80, NUDOCS 8009090410
Download: ML19331E233 (2)


Text

.. _.

2 jj i:

r sun.r== -

Por:!and General Elcctric Company

. Trojan Nuclear Plant P.O. Box 439 3

Rainier, Oregon 97048 (503)356-3713 August 28, 1980 CPY-830-80 fo-s4Y Mr. R. R. Engelken, Director Nuclear Regulatory Coc:21ssion, Region V 1990 North California 31vd.

Walnut Creek, CA' 94596

Dear Sir:

In accordance with the Trojan Plant Operating License, Appendix A, US NRC Technical Specifications, Paragraphs 3.3.3.3.b and 6.9.2, attached is a report concerning a situation where a seismic nonitoring instrunent was inoperable for a period exceeding thirty days.

l Sincerely, C.

. Yundt General Manager CPY/DL3:na Attachnent-c:

LER Distribution g so!

t l

n, s

y\\o

/

8009090

=u y

}4 n -

L~,

]l i

~

'SPECIAL REPORT

}

i

~

-1. l Report No.:-

I N/A 12.1 la.'

-Report.Date:

. August 28, 1980 g

t b.

-0ccurrence Date:-l July 21, 1980 j

3..: Facility:, Trojan Nuclear Plant, PO Box 439, Rainier, Oregon 97048

~

i 4.

Identification of 0ccurrence:

I One seismic sensor, ST 6336 in the Cable. Spreading Room, was inoperable for:a period greater than thirty days.

t 0

s-5.

Conditions Prior to occurrence:

9 b

The plant was in Mode 1, power operation, at the time of the occurrence.

'6.

Descriotion of Occurrence:

During monthly functional testing, seismic monitoring sensor ST 6336 -

Cable Spreading Room, did not respond acceptably.

7.

Designation of' Apparent Cause of Occurrence:

The cause'of this failure.was equipnent malfunction. The seismic triaxial accelereceter ST 6336 in the Cable Spreading Room failed to functionally test.

4 8.

Analysis of Occurrence:

This event had no effact on plant ee public safety. During this period, all other triaxial accelerographs were operable.

9.

Corrective Action:

The immediate corrective action was to attempt a repair of the instrument.

When the onsite repair was not satisfactory, appropriate spares were obtained.

The channel was repaired and, returned to service August 26, '.980,

.five days ~past the 30-day. period. The pernanent corrective action is to

~

~

maintain. sufficient spare parts onsite.