IE Insp Rept 50-267/80-14 on 800616-19.Noncompliance Noted: Failure to Document Qualifications of Personnel Performing Calibrs on Measuring & Test Equipment & Failure to Provide Record of Test Equipment
ML19331E094
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/11/1980
From: Gagliardo J, Westerman T, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19331E090 List:
References
50-267-80-14, NUDOCS 8009050477
Download: ML19331E094 (7)


See also: IR 05000267/1980014

Text

.

-

~

0

U. S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

'

IE Inspection Report No. 50-267/80-14

Docket No. 50-267

License No.

DPR-34

Licensee:

Public Service Company of Colorado

P. O. Box 840

Denver, Colorado

80201

Facility Name:

Fort St. Vrain Nuclear Generating Station

Inspection At:

Fort St. Vrain Site, Platteville, Colorado

Inspection. Conducted: June 16-19, 1980

Inspectors:

an)Ij k

o/80

t

7 Ispector

Ilate~

L. A. Yan' dell, Reacte

~

1

IO S

11

~1

E0

M'T.peshansley,

sactor Inspector

atd

Reviewed by:

(

8')

1"I

J!. \\ E .

ag:.iardo, Chief, Nuclear Support Section

Dats

i

Approved by:

9

}O

[.\\ F. Westerman, Chief, Reactor Projects Section #1

Datd

j

e

.

Inspection Summary

Inspection egnducted during the pericd of June 16-19, 1980

(Report No. 30-267/80-14)

Areas Inspected:

Routine, unanncunced inspection of control and calibration

of measuring and test equipment.

The inspection involved forty-two (42)

inspector-hours on-site by two (2) NRC inspectors.

3

8009050 %

,

.

.

.

.

-

--

.

.

1

2

Results: Within the areas inspected, two items of noncompliance were identified

'

ldeficiency - Failure to document qualifications of personnel performing

,

calibrations on Measuring and Test Equipment, paragraph 2.b.; and infraction -

'

'

Failure to provide a record of test equipment, paragraph 2.a.)

,

i

i

t

f

1

,

!

l

i

J

i

.

l

- - .

.

-

.

._

- -

. _

.

,.

. _ - , _ - -

.

- . . . , , , . . . .

-.

-

__

.

.

3

DETAILS

1.

Persons Contacted

  • L. Brey, QA Manager

W. Craine, Maintenance Superintendent

W. Franek, Resulte Supervisor

  • E. Hill, Operations Superintendent
  • W. Hillyard, Administrative Services Manager

1

R. Lamb, Electrical Working Forman

  • F. Mathie, Operations Manager
  • P. Tixier, QA Engine.er

!

  • D. Warembourg, Manager Nuclear Production

P. Zimmerman, Senior 7'strument Technician

i

The inspectors also es

Tcted ether plant personnel including maintenance

men, electricians, teci

ians and administrative personnel,

i

  • Those present at exit int _ view.

l

2.

Test and Measurement Equipment Program

.

,

The inspectors reviewed the licensee's program for control of test

a.

and measurement equipment to ensure that (1) criteria for calibration

frequency have been established, (2) equipment inventory lists

and calibration procedures exist, (3) equipment is marked with latest

and next due calibration dates, (4) a syntem is established for

calibrating equipment prior to due date, and (5) controls exist for

evaluating out-of-calibration equipment and the items previously

tested or measured by this device.

The following procedures and records were reviewed that describe

and implement the Fort St. Vrain program for controlling test

and measurement equipment:

ADM-14, Aaministrative Procedure for Calibration of Plant

Instrumentation and Test Standards

QAP-1100, Calibration and Maintenance of Tools, Instruments and

Control Equipment.

-Standard and Test Equipment Lists.

RP-21, Results Calibration Standards.

-Calibration Standard Accountability Cards.

PME-29, Calibration of Electrical Maintenance Meters and Thermometers.

-Instrument Usage Record.

MP-102, Procedure for the Calibration of Mechanical Maintenance Tools

and Equipment

--

-,

--

- _ _ - _ - _ .

,

M

a -

A

-

-e

~

-

.

,

4

.

A representative sample ef surveillance procedures were reviewed

to identify test equipment and dates used for comparison with

calibration records. The following equipment calibration records

were reviewed:

'

Results Section

PI-0005, 0-3000 psig test gauge

PSC 3106, Simpson 260

PSC 3131, DC Calibrator, Foxboro 8121

PSC.3135, Picoamphere source, Keithley 261

PSC 3147, DVM 8600A

PSC 3150, DVM 8600A

PSC 3153, DVM 81003

PSC 3154, DVM 8120A-01

PSC 3172, Counter, Ortec 772

PSC 3175, Function Generator

PSC 3198 Simpson 313-2

Mechanical Maintenance Group

Micrometer set, 1"-11"

Argon regulator, FSV W-8

Torque wrench, FSV MI-30

Torque wrench, FSV MI-27

Micrometer, FSV MI-2

Electrical Maintenance Group

M-3G25, Simpson 260

M-3699, Simpson DMM

M-3010, Weston model 904, AC voltmeter

i

M-3081, Simpson DMM

t

. - . . .

-

.._..

-

-,..

-.- --

.

.

I

l

5

,

As a result of these reviews, the inspectors had the following

findings:

While reviewing the Station Battery and PPS Check Surveillance

Procedure SR 5.6.2a-W for February 11 and April 16, 1980, it was

noted by the inspector that the test conduccor had failed to identify

the calibration equipeent used in Section 3.0.

This is centrary to

the requirements of ADM-13, Administrative Procedure for Technical

Specification Surveillance which states in Section 2.5d that the test

conductor "is responsible for assembling test equipment, special

tools and other items specified by the telt procedure and identifying

them in Section 3.0 of the SR."

While reviewing the Calibration Standard Acccuntability Cards, it

was noted by the inspector that the card for PSC-3178 did not identify

device PSC-3172 as being calibrated by this device.

This is contrary

to the requirements of 1) QAP-1100, Calibration and Maintenance of

Tools, Instruments and Control Equipment, step 3.1.10 which requires

that " lists be maintained of each standard and tect equipment versus

the equipment it was used to calibrate or measure," and 2) RP-21,

Results Calibration Standards,Section III.A. which requires that

"the appropriate entries shr.11 be made on the Calibration Standard (s)

Accountability Card (s)."

The inspector noted also that no entries had been made on the

accountability cards since about October 1979 identifying test

equipment used for surveillance procedures.

This is contrary to

RP-21,.Section III.A. which requires that "the appropriate entries

shall be made on the Calibration Standard (s) Accountsbility Cards."

It was determined that the record of test equipment used for

surveillance procedures was being kept on a separate document.

While reviewing the Instrument Usage Record it was noted by the

inspector that the record failed to identify that for surveillance

procedure SR 5.6.2b-Q, device M-3699 was used for a February 15, 1980

calibration and device M-3081 was used for a May 9, 1980 calibration.

This is contrary to the requirements of Step 3.1.10 of QAP-1100 and

step 9.1.6 of PME-29, Calibration of Electrical Maintenance Meters

and Thermometers, which request that an " Instrument Usage Record will

be maintained on safety-related equipment."

These examples of failure to follow procedures constitute an apparent

item of noncompliance at the infraction leve? (80-14-01).

In cunjunction with these findings, the inspector expressed concern

to the licensee tFst surveillance procedures were being signed off

by supervisory and management personnel without proper review.

Section 6.0 of aDM-13, Administrative Procedure for Technical Speci-

fication Surveillance states that the presence of initials or signa-

tuces indicates that the procedure has been properly performed and

..

.

.

.

.

6

reviewed for completeness.

Examples identified in this and earlier

reports indicate that licensee personnel are not fully implementing

this requirement by performing an adequate review of surveillance

procedures.

The licensee is requested to address this matter when

responding to the item of noncompliance,

b.

The inspector reviewed records of calibration of measuring and test

equipment which'was calibrated by results department personnel.

The

following records were reviewed:

Instrument

Calibration Date

Person Performing Calibration

Pressure Test Gauge,

1-7-80

J. Pinner

i

Serial.0005

Cetec Counter,

2-17-80

P. Zimmerman

'

Serial M3172

Pressure Test Gauge,

4-22-80

T. Kennedy

Serial 112

,

ADM-14, Administrative Procedure for Calibration of Plant Instrumenta-

tion and Test Standards required that only qualified personnel be

assigned to calibrate test equipment. The qualification requirements

for results department personnel were established by the Training

Procedures Administrative Manual, Form R-1.

Qualification requirements for Instrument Technicians and Senior

Instrument Technicians did not include calibration of measuring and

test equipment.

Calibration records indicated that technicians were

actually performing the calibrations.

10 CFR 50, Appendix B, Criteria

XVII requires that " sufficient records be maintained to furnish

evidence of activities affecting quality." The failure to provide

,

sufficient documentation cf the qualification of Instrument Technicians

and Senior Instrument Technician constitutes an apparent item of

noncompliance at the deficiency level. (80-14-02).

While examining several pieces of test equipment and their calibration

c.

stickers, the inspectors noted that many devices called for six

,

month calibration intervals.

This conflicts with the official,

computerized calibration schedule maintained by the Results Section

that in general, identifies one year calibration intervals. This, in

j

turn confilets with ADM-14 (Sections 3.2.4 and 3.3.4) which requires

'

that the calibration stickers, (not a computerized list) show the

next calibration due date.

Everyone interviewed was aware of this

conflict and recognized that the computerized list was the governing

i

document for scheduling calibrations.

QASP 1102, attachment 6.1-79-02

,

dated October 30, 1979, prepared by the FSV QA organization had already

identified this issue and recommended that this conflict be resolved.

'

This will remain an open item until this action has been completed

and reviewed.

(open item 80-14-03).

No other apparent items of noncompliance or deviation were identified.

'

.

~-

.

-

.

_- .-

.-

-

.

.

'

. .

,

7

3.

Exit,_ Interview

An exit interview was conducted on June 19, 1980 with Mr. Warembourg

and other members of the plant staff to summarize the scope of the

inspection and the findings.

In responding to the matter of adequate

review of surveillance procedures, the licensee stated that an extensive

QA audit in this area has already been initiated to address this issue and

provide recommendations for corrective measures.