s UNITED STATES NUCLEAR REGULATORY COMMISSION
~
n aE REGION 11 o
'8 101 MARtETTA ST., N.W.. SUITE 310o E
$g * " " o ATLANTA, GEORGIA 30303 AUG 121980 In Reply Refer To:
RII:WHM 70-1151/80-19 Westinghouse Electric Corporation ATTN:
M. D' Amore, Manager Columbia Plant Nuclear Fuel Division Drawer R Columbia, SC 29205 Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this office on July 21-22, 1980, of' activities authorized by NRC License No. SNM-1107 for the Westinghouse Nuclear Fuel Division facility, and to the discussion of our findings held with W. J. Hartnett at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinaticr.s of procedures and representative records, interviews with personnel, and obsertations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Three new unresolved items resulted from this inspection and are discussed in the enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Decument Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
/
rph ief
/ Reactor Construction and Engineering Support Branch
Enclosure:
(See Page 2) 8009050/73
A11G 121980 Westinghouse Electric Corporation
Enclosure:
Inspection Report No. 70-1151/80-19