ML19331D999
| ML19331D999 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/05/1980 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GM-663, IEB-79-03A, IEB-79-3A, NUDOCS 8009040637 | |
| Download: ML19331D999 (2) | |
Text
,
77CL
'!TGC RErt Georgia Power CcNany
' I
Post Offce Box 4545 L
Atlanta, Georg.a 30302 Tewone 404 52>coeo 7 /-
= 2: 02 Vogtle Proj,ect Southern Copy Servces, Inc.
Post Offce Box 2620 Bwmingham, Alabama $5202 Telephone 205 870-6011 August 5, 1980 United States Nuclear Regulatory Commission
Reference:
Office of Inspection and Enforcement RII:-JP0^
Region II - Suite 3100 50-424 101 Marietta Street 50-425
~
y' Atlanta, GA 30303 File: X7BC24 Attention: Mr. James P. O'Reilly Log:
GM-663 Gentlemen:
The following is submitted in response to your letter dated April 4, 1980 concerning I.E. Bulletin 79-03A.
Georgia Power Company has not identified any welded SA-312 or A-312 piping that exceeds pressure design stresses of 85% of the maximum allow-able stress at the design temperature. Westinghouse, our NSSS supplier, is still investigating this problem as applicable to equipment under their scope and has requested an extension to October 1,1980 to respond to this bulletin.
Georgia Power Company will provide the additional information con-cerning this bulletin by October 1,1980 if this is acceptable to you, tru s,
%44:Dr-Doug Duttpn Project General Manager CWH:tp xc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC M. D. Hunt - USNRC, Region II
.,up g %p' C Dpp 8009040dph Q
e.
Mr. James P. O'Reilly RII: JP0/50-424; 50-425 August 5, 1980 Page 2 xc:
J. H. Miller, Jr.
W. E. Ehrensperger F. G. Mitchell, Jr.
R. J. Kelly R. E. Conway R. W. Staffa J. T. Beckham K. M. Gillespie C. W. Hayes E. D. Groover D. L. McCrary R. A. Thomas M. Z. Jeric J. L. Vota 1