USNRC REGCM :
gygA. cr n %:t Georgia Power Company Post Office Box 4545 h
30 m 5 Pg. 02 Atlanta, Georgia 303o2 Vogtle Project Telephone 404 522-6 60 Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 2o5 87o-6011 August 5, 1980 United States Nuclear Regulatory Commission
Reference:
Office of Inspection and Enforcement RI.I;_ JP0 Region II - Suite 3100 50-424 101 Marietta Street 50-425 Atlanta, GA 30303 File:
X7BC24 Attention: Mr. James P. O'Reilly Log:
GM-664 Gentlemen:
The following is submitted in response to your letter dated March 10, 1980 concerning I.E.Bulletin 80-05.
Georgia Power Company has reviewed the following tanks:
- Volume Control Tank
- Boric Acid Storage Tank
- Boron Recycle Holdup Tank Component Cooling Water Surge Tank
- Auxiliary Component Cooling Water Surge Tank Waste Evaporator Concentrates Holdup Tank i
Adequate measures have been taken to protect against vacuum condi-tions in these tanks. Tank vent lines have been sized consistent with pump suction lines to ensure that fluid flow out of these tanks cannot exceed air flow into these tanks. These tanks and vents are located indoors; therefore, freeze protection for the vents is not provided.
The volume control tank operates with a cover gas. This tank is protected from a vacuum condition by a cover gas makeup path with a control valve sized to admit the cover gas at a rate high enough to keep up with the maximum rate of liquid removal from the tank.
The only tanks with valves in the vent lines are the boron recycle holdup tanks. The primary vent line is equipped with two air operated, normally open valves in series which vents to the tank room atmosphere.
Another vent for these tanks is provided through a continuous vent from the piping penetration filter exhaust system, a safety-related system. There-fore, an inadvertent closure of a valve in the primary vent line would not OFFICIAL COPY t$ 009 0 40(,35 g
3 i
Mr. James P. O'Reilly RII:.JPO, 50-424; 50-425 August 5, 1980 Page 2 result in an inability to vent the tank. A local overflow / vent with a siphon breaker is provided under the diaphragm.
These tanks are considered acceptable and no additional action is planned.
\\
d Doug Dut n Project General Manager 1
CWH:tp xc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC M. D. Hunt - US!!RC, Region II J. H. Miller, Jr.
W.. E. Ehrensperger F. G. Mitchell, Jr.
C. F. Whitmer R. J. Kelly R. E. Conway R. W. Staffa J. T. Beckham K. M. Gillespie C. W. Hayes E. D. Groover D. L. McCrary R. A. Thomas M. Z. Jeric J. L. Vota
{