Response Stating No Opposition to NRC 800812 Motion That Tech Specs Proposed in Director of Ofc of Nuclear Reactor Regulation 800211 Order Be Amended Per 800811 Mod.Formal Amend Will Await Hearing Outcome.W/Certificate of Svc
ML19331D514
Person / Time
Site: Crane 
Issue date: 08/27/1980
From: Ridgway D, Trowbridge G
METROPOLITAN EDISON CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OLA, NUDOCS 8009030118
Download: ML19331D514 (5)


Text

\\

.\\\\\\?,

D August 27, 1980 9

27 2.173 o

>y i

2 9 $80 3>

{

5'D ^! :he &mic

'i

-M eg S S e

B:anch

/

AJ

~.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-320 OLA

)

(Three Mile Island Nuclear

)

Station, Unit No. 2)

)

LICENSEE'S RESPONSE TO STAFF'S MOTION TO CONFORM PROPOSED TECHNICAL SPECIFICATICNS IN ACCORDANCE WITH MODIFICATION OF ORDER By Order of the Director, Office of Nuclear Reactor Regulation, dated February 11, 1980, the Commission established a set of formal license regnirements reflecting the post-accident condition of the TMI-2 facility and assuring the continued maintenance of the current safe, stable, long-term cooling condition of the Jacility.

The February 11 Order further provided that the requirements of the proposed Technical Specifications (attached to the Order) were immediately ef fective, with an opportunity for hearing prior to the efrec eiveness of the proposed formal license amendment.

At the time the February 11 Order was issued, both the Staff and Licensee anticipated that, during the 1b

)O pendency of this matter, changes in the proposed Technical B009030I b

. Specifications might be necessary as the facility status evolves as a result of ongoing recovery efforts.

On August 11, 1980, the Deputy Director of the NEC Office i

of Nuclear Reactor Regulation issued a Modification of Order, eliminating the requirements for availability of two balance-of-plant (BOP) diesel generators and an external 13.2 kv transmission line imposed pursuant to the Director's Order of February 11, 1980.

Under the terms of the Modification of Ordar, the two BOP diesel generators and the 13.2 kv transmission line are replaced with an existing 230 kv grid system.

Notice of the August 11 Modification of Order was published at 45 Federal Register 54495-96.

By the August 12, 1980 "NRC Staff Notice of Issuance of Modification of Order and Motion To Conform Proposed Technical Specifications In Accordance Therewith," the Staff has moved that the proposed Technical Specifications attached to the February 11, 1980 Order be formally modified in accordance with the Modification of Order of August 11, 1980, subject to the authority which 10 C.F.R. 2.717(b) reserves to the Licensing Board in this proceeding.

As Licensee understands the Staff's motion, it is simply a request by the Staff that the Board issue an order notifying all parties that the proposed Technical Specifications under consideration in the prospective hearing requested in this proceeding are revised in accordance with the August 11, 1980 Modification of Order (i.e.,

the document before the Board is revised to replace the

. pages 3.8-1, 3.8-2, and 3,9-3 attached to the February 11, 1980 Order with the pages 3.8-1, 3.8-2, and 3.8-3 attached to the August 11, 1980 Modification of Order).

The formal license amendment incorporating the proposed Technical Specifications, as modified, would await the outcome of the prospective hearing.

With this understanding, Licensce does not oppose the motion.

Respectfully submitted, SHAW, PIT

, POTTS & TROWBRIDGE By:

hs M

./

g ' G(orge TV Trowbridef delissa A. Ridgway Dated:

August 27, 1980 l

August 27, 1980 UNITED """ATES OF AMERICA NUCLEAR hEGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-320 OLA

)

(Three Mile Island Nuclear

)

Station, Unit No. 2)

)

CERTIFICATE OF SERVICE I hereby certify t.'at copies of " Licensee's Response To Staff's Motion To Conform Proposed Technical Specifications In Accordance With Modification of Order" were served upon those persons on the attached Service List by deposit in the United S ates mail, postage prepaid, this 27th day of August, 1980.

bi porige F.'Trowbridge/

Dated:

August. 27, 1980

s e

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION i

In the Matter of

)

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-320 OLA

)

(Three Mile Island Nuclear

)

Station, Uriit No. 2)

)

SERVICE LIST John F. Wolf, Esq.

Karin W. Carter, Esq.

3409 Shepherd Street Assistant Attorney General Chevy Chase, Maryland 20015 505 Executive House P.O. Box 2357 Dr. Oscar H. Paris Harrisburg, Pennsylvania 17120 U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Docketing and Service Section (3)

Panel Office of the Secretary Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Mr. Frederick J. Shon Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Washington, D.C.

20555 Lawrence J. Chandler, Esq. (1)

Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.

20555 J. H. Johnsrud Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Steven C.

Sholly 304 South Market Street Mechanicsburg, Pennsylvania 17055 William A.

Lochstet 119 E. Aaron Drive State College, Pennsylvania 16801

. -.