Responds to NRC Re Violations Noted in IE Insp Rept 50-327/80-21.Corrective Actions:Procedures to Perform Isometric walk-down Insp & Engineering Evaluations in Support of IE Bulletin 79-14 Approved & Issued
ML19331D147
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/19/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-14, NUDOCS 8008270377
Download: ML19331D147 (2)


Text

o.

r a

TENNESSEE VALLEY AUTHORITY o

CH ATTANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II August 19, 1980 Mr. Janes P 0'Reilly, Director uffice of Ins crion and Enforcement U.S. Nuclear Re atory Commaission Region II - Suit 100 101 Marietta Stree Atlanta, Georgia 30 3

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 1 - NRC-01E REGION II LETTER RII:LM 50-327/80-21 INSPECTION REPORT - RESPONSE TO IliFRACTION The subject letter dated July 25, 1980, cited TVA with one infraction in accordance with 10 CFR 2.201.

Enclosed is our response.

\\

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FIS 657-25dl.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Erd esure cc:

Mr. Victor Stallo, Jr., Director (Enclosure Office of Inspection and Enforcement U.S. Nuclear Regulatory Conmission Wasnington, DC 20555

[o l o

s ih I

600827o 37 7 an cou, f coo,may em,,c,,,

u.

O ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 RESPONSE TO INFRACTION 327/80-21-01 Infraction 327/80-21-01 As required by Section 6.8.1 of the technical specifications, " Written procedure shall be established, implemented, and maintained covering the activities referenced in Appendix A of Regulatory Guide 133, Revision 2," and TVA Division of Engineering Design, Enginee' ring Procedure EN DES-EP 1.01, Preparation and Processing of Division-Level Engineering Procedures, Section 3 1, states that all activities affecting the quality of design, construction, and operation will be done with controlled written instructions or procedures.

Contrary to the above, as of June 26, 1980, approved written procedures were not available to perform the isomstric walk-down inspections and engineering evaluations.

Corrective Steps Which Have Been Taken and Results Achieved At the time of the actual inspection work, it was inaccurately ' believed that Sequoyah Nuclear Plant Maintenance Instruction 6.17 (MI 6.17) fully met the requirements of the NRC. Upon joint review during the June 24-26 inspection, it was agreed that this was not true. On July 14, 1980, the procedures actually followed by design employees were approved and issued.

In addition, approved procedures were issued before the current IE Bulletin 79-14 inspection work began on Sequoyah unit 1.

Corrective Steps Which Have Been Taken to Avoid Further Noncompliance The appropriate employees have been informed that all future TVA efforts with respect to IE Bulletin 79-14 require approved procedures before any ac tions.

Date When Full Compliance Will Be Achieved We are now is ibl1 compliance.

.