TOPICAL REPORT EVALUATI0t{
Report Number:
TVA-TR75-1A, Revision 4, Nonproprietary Report
Title:
Quality Assurance Program Description
. Report Date: August 11, 1977 Revised August 1980 Originating Organization:
Tennessee Valley Authority Reviewed by: Quality Assurance Branch
SUMMARY
OF TOPICAL
- Topical Report TVA-TR75-1A, Revision 4, describes the quality assurance program
-which the Tennessee Valley Authority applies to those design, procurement, construc-tion, preoperational testing, and operations phase activities involving safety- --
related structures, systems, and components of nuclear power plants within the Tennessee Valley Authority scope of work.
TVA-TR75-1A, Revision 4, commits the Tennessee Valley Authority to comply with the requirements of Appendix B to 10 CFR Part 50.
It also conmits the Tennessee Valley Authority to follow the NRC Reguia-tory Guides and ANSI standards listed below or has-provided alternatives which the staf f has found acceptable.
Design &
O eration_
Construction _
J Regula tory Guide 1.8 NA 9/75 1.28 6/72 3/78 1.30 8/72 8/72 1.33 NA 2/78 1.37 3/73 3/73 1.38 10/76 5/77.
1.39 10/76.
9/77 1.58 8/73 8/73 1.64 6/76 6/76 1.74 2/74 2/74 1.88 10/76 10/76 l
1.94 4/76 4/76 l
1.116 6/76 6/76 1.123 10/76 7/77 ANSI N45.2.12 (D3, R4) 2/74 2/74 The Tennessee Valley Authority has provided for our evaluation a detailed organiza-tional description of those individuals and groups involved in carrying out activi-ties required by the quality assurance program.and a delineation of duties, respon-l l
sibilities, and authority of those organizational elements involved in the quality Revision 4 of TVA-TR75-1A contains a-description of the measures assurance program.
used to-carry out the Tennessee Valley Authority quality assurance program activities and describes how applicable requirements of Appendix 8 to 10 CFR Part 50 will be satisfied by the administration and implementation of these measures.
l l-i
- 00827 o /qg
... o SUMMRY OF REGULATORY EVALUATION AND POSITION We have evaluated the quality assurance program and the organizations responsible for quality assurance functions described in Revision 4 of TVA-TR75-1A. We find-that quality assurance policy and direction originate at an acceptably high manage-ment level and are effectively communicated to other parts of the organization.
Those performing quality assurance functions have responsibility and authority connensurata with their duties in _ implementing the program. We also find that measures have been established to be implemented by written procedures and. instruc-tions, which address each of the criteria of Appendix B to 10 CFR Part 50 in an acceptable manner.
Based on our review and evaluation of TVA-TR75-1A, Revision 4, we conclude that:
1.
The organizations and persons performing quality assurance functions within the Tennessee Valley Authority have the required independence and authority to effectively carry out the quality assurance program without undue. influence from those directly responsible for costs and schedules.
2.
The Tennessee Valley Authority quality assurance program contains requirements and controls which, when properly implemented, comply with the requirements of Appendix B to 10 CFR Part 50.
3.
The Tennessee Valley Authority Topical Report TVA-TR75-1A, Revision 4, " Quality Assurance Program Description," is acceptable for use in the design, procure-ment, construction, preoperational testing, and operations phase activities of TVA's nuclear power plants.