s-J p Gp TOLEDO
%mm EDISON Fheni.nop caoest Docket No. 50-346 License No. NPF-3 U.7 Serial No. 1-155 me m221 August 6, 1980 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect: Davis-Besse Nuclear Power Station Unit No. 1 Cracking in Feedwater System Piping
Dear Mr. Keppler:
This letter is in response to IE Bulletin 79-13, Revision 2, dated October 19, 1980 (Log No. 1-257), as applicable to Davis-Besse Nuclear Power Station Unit No. 1 (DB-1) relating to cracking in feedwater system piping.
Toledo Edison was required to perform a visual inspection of all feedwater system piping supports and snubbers in containment to verify operability and conformance to design.
The operability of the snubbers installed in the main and auxiliary feedwater lines was veritied on July 1, 1980 by performing Surveillance Test Procedure 5044.01. This surveillance test aeets the requirements of DB-1 Technical Specification 4.7.7.1.2.
Conformance to design of the main and auxiliary feedwater supports will be verified through the inspections required by IE Bulletin No. 79-14.
Any deficiencies found will be reported under IE Bulletin No. 79-14.
As a result of the above actions, this completes Toledo Edison's response to this bulletin.
Yours very truly, ff
==
RPC:twh cp b/15 THE TOLEOO EDISON COMPANY EOISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 80082700%0 ggg i i W s