05000267/LER-1980-040, Forwards LER 80-040/03L-0

From kanterella
(Redirected from ML19331C832)
Jump to navigation Jump to search
Forwards LER 80-040/03L-0
ML19331C832
Person / Time
Site: Fort Saint Vrain 
Issue date: 08/11/1980
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19331C833 List:
References
P-80259, NUDOCS 8008190608
Download: ML19331C832 (3)


LER-1980-040, Forwards LER 80-040/03L-0
Event date:
Report date:
2671980040R00 - NRC Website

text

=

1 public sendee company oe ocacesrlo i

)

16805 ROAD 19%

t.. J PLATTEVILLE, COLORADO 80651 August 11, 1980 Fort St. Vrain Unit No. 1 P-80259 0

C I gls DOCUh pg z

Mr. Karl V. Seyfrit, Director POOR QUtW Nuclear Regulatory Commission

[

Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Reference: Facility Operating License No. DPR-34 Docket No. 50-267

Dear !!r. Seyfrit:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/

80-40, Final, submitted per the requirements of Technical Specification AC 7.3.2(b)2.

Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/80-40.

Very truly yours, WMA:

Don Ware = bourg Manager, Nuclear Production DV/cis Enclosure 002 cc: Director, MI?C g

//

8008190 gg 5

4 i

4 l

4 REPORT DATE:

August 11, 1980 REPORTA3LE OCCURRENCE 80-40 l

IJSCE 0 OCCURRENCE DATE:

July 12, 1980' Page 1 of 2 FORT ST. VRAIN NUCLFAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO j

16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO S0651

. REPORT NO. 50-267/90-40/03-L-0 Final I

- IDE';TIFICATION CF OCCURRENCE :

On July 12,'1980, a sample requireo by SR NR 1.? was not taken. This is being reported as a. degraded mode of surveillance requirement NR 1.1 per Fort St. Vrain Technical Specification AC 7.5.2(b)2.

t a

E7ENT DESCRI? TION:

While operating at less than 2." power, the plant's semi-annual tes: of :he 4

auxiliary cooling method valves and equipment was being condue:ed on the day shif: of July 12, 1980. This is a long and ' involved surveillance and it ex: ended through the shif t.

The Operator assigned to collec: the NR 1.1

- sample was involved in svi:ching electrical supplies oto :he various equip-1-

men: and was unable to get to the sample point during the shift. Extra Operations personnel vere on si:e to assist vith the performance of the surveillance.

The sa:ples prior to and af:er'this missed sample were normal, and there is no indication tha: the chenistry changed during this period.

CAUSE

l

DESCRIPTION

1 The' sample was not taken because abnor=al plant operatiens preempted :he Operator's time.

CCRRECTIVE ACTION:

The sa ple was taken the next shif: as required, and the surveillance was marked to indicate why the missing sample was no: :aken.

There was no affect en public health or safety.

j No further correc:ive action is anticipated er required, i

i

+

t i

f

. - -, -,,,,.,,,, -,.. -,, - -,, -,. -, -,,. -, -. - _,.., -. -.,,,,,,,,,, - ~

_3 REPORTA3LE OCCURRE::CE S0-33 ISSUE O Page 2 of 2 Prepared 3y:

_ /da,

/ M t[

e, Asa 3. Reed Technical Services Technician-

]/ r.- / /'

,f. // / [ f / h Reviewed 3y:

f. W. Gah:

2.

gTechnicalServicesSupervisor 7DH Reviewed 3y:

Frank :1. Mathie Operations Manager i