public service company e escardo 16805 ROAD 19%
PLATTEVILLE, COLORADO 80651 hg August 12, 1980 9
Fort St. Vrain Unit No.1 g
P-80265 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforce =ent 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Reference: Facility Operating License No. DPR-34 Docket No. 50-267
Dear Mr. Seyfrit:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
80-35, Revised Final, submitted per the requirements of Technical Speci-fication AC 7.5.2(b)2.
Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/80-35.
Very truly yours, W. tat Don Wareebourg Manager, Nuclear Production DW/cis Enclosure ec: Director, MIPC Y
N '7.,i 80081908%
3
o REPORT DATE:
August 12, 1980 REPORTABLE OCCURRENCE 80-35 ISSUE 1 OCCURRENCE DATE:
June 25, 1980 Pa ge 1 o f 3 FORT ST GAIN NUCLEAR GENERATING STATION PU3LIC SERVICE COMPA'iY OF COLORADO 16805 WELD COUNTY ROAD 19 1/2 PLATTEVILLE, COLORADO 80651
/
REPORT NO. 50-267/30-35/03-X-1 Revised Final
.;ENTIFICATION OF CCCURRENCE:
During the regeneration of a batch of condensate polisher resin, waste water was discharged to the plant liquid effluent system instead of the waste neutralizing tank. This resulted in a degraded mode of LCO NR 1.1, and is reportable per Fort St. Vrain Technical Specification AC 7.3.2(b)2.
EVENT
DESCRIPTION
On June 25, 1980, at approxi=ately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, the valves, D-12 and D-13 (See Figure 1), which control the discharge path of waste water from the con-densate polisher resin regeneration system did not automatically line up properly and discharged the waste acid and caustic used in resin regener-ation to the turbine building sump instead of the waste neutralization tank.
This resulted in the waste water being discharged to the yard drain and then to the Goosequill Ditch.
Fort at. Vrain Technical Specification LC0 NR 1.1 requires that the regener-ation effluent be stored in lined evaporation ponds, and establishes li=its for various chemicals in the ef fluent. The discharge of the regeneration vaste water to the Goosequill Ditch was not in accordance with the Technical Specification. Three of the chemical limits of LCO NR 1.1 were exceeded as noted below.
Ma:ci=us Concentration ie :ual C,11; tituent Or Value Cplue Cu 1 ppm 1.3 ppm Zn 5 ppm 9.2 pps pH 6.0 - 9.0 1.9 - 9.8
REPORTA3LE OCCURRENCE 80-35 ISSUE 1 Page 2 of 5 EVENT
DESCRIPTION
(Cont'd)
The remaining require =ents of the LCO were satisfied as the liquid effluent did follow the prescribed discharge paths.
tihen the abnormal Goosequill chemistry was observed, the possible sources were investigated and the problem with the condensate polisher resin regen-eration system was discovered. I:=ediate action was taken to terminate the release of regeneration chemicals by manually overriding the discharge path selector and putting all the waste water to the neutralizing tank. Corrective action returned chemical constituents to acceptable concentrations uithin the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> required.
Due to the high pH water being discharged to the Goosequill Ditch, the pH 4
of the farm ponds rose to higher than normal values, as follows:
9 f
pH j
Date Time (Farn pond) i j
6-26 1500 Hours 10.3 i
g 6-27 Not Tagged 9.45 6-27 Not Tagged 9.95 6-23 No t Ta gged 9.12 l
6-29 1215 Hours 8.97 The high pH values from June 25 to June 29, 1980, were the restit of the June 25 discharge from the plant and the delay time involved in this water l
passing through the farm ponds. This can be seen from the pH of the Goose-l quill over the sa:e period.
l t
pH l
Date Time (Goosecuill) 6-25 1110 Hours 1.92 l
i 6-25 1315 Hours 9.30 l
6-25 1930 Hours 3.6 l
6-26 0035 Hours 3.9 4
6-26 1210 Hours 3.35 I
6-26 1930 Hours 3.4 l
4 REPORTABLE OCCURRENCE 80-35 ISSUE 1 Page 3 of 5 EVENT
DESCRIPTION
(Cont ' d) pH Date Time (Goosequill) 6-27 lat Shift 8.5 6-27 2nd Shift 8.45 6-27 3rd Shift 8.25 6-2S lst Shift S.4 I
j 6-23 2nd Shif t 8.4 I
l 6-23 3rd Shif t 8.4 6-29 1st Shif t 8.5 6-29 2nd Shift S.9 6-29 3rd Shif t 8.7 8
l The chemical concentrations of the Goosequill water were all within limits by the 1930 hour0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> sample on June 25, 1980, approxi=ately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after the
{
problem s tarted.
i
CAUSE
DESCRIPTION:
The inadvertent discharge of the regeneration waste water was due to a failed conductivity cell in the vaste water line which prevented proper auto =atic valve line up.
This equipment failure could not have been avoided or the dischar3e prevented by = ore frequent process sampling or testing of the in-strument.
I CORRECTIVE ACTION:
Immediate action consisted of manually directing regeneration vaste water to the neutralizing tank.
Followup actions were to continue the sampling until chemical concentrations were within LCO lTR 1.1 limits. The conductivity element was replaced, and discharge valve operability was verified.
No further corrective action is anticipated or required.
y g9 -
_r,9,,-,-,.p--
y u
p-ye-y9 4-n-pe-.
y y--
9-,
w c-M-
REPCRTA3LE OCCL*RRD*CE 30-35 ISSG 1 Page 4 of 3 1
3eck=an Solubridge Waste Water From Regener-3_13 6 l
ation Skid C
4 D
I l
8D-12 l
2 n.......o o-I i
- - nigh con-
,3 Cr i
lductivity Alar::
7 Turbine Wasts Neutrali:2:icn Tank 3uilding Susp i
l t
1 l
l Ob.b I
l I
i 1
i l
l i
't 1
REPORTABLE OCCURRENCE 80-35 ISSUE 1 Page 5 of 5 i
1 Prepared By:
44 4 Asa 3. Reed Technical Services Technician i
i Reviewed By:
J. W. Gahm Technical Services Supervisor [V
Reviewed By:
U Frank Of. !athie Operations ".anager i
l j1 9
Approved Sy:
/Li, Mue~#W Manager,NuclearProduc/
Don h'arembourg j
cion I
l l
B r
i i
1
..n-
--m r
...n.
s n.
.--.v-.,
,w.n,-
e-
,,.4
..,m,.vn_....,.,,-~
~.-
m
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000267/LER-1980-001-03, /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | | | 05000267/LER-1980-001-01, /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | | | 05000267/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000267/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000267/LER-1980-002-03, /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | | | 05000267/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000267/LER-1980-003-03, /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | | | 05000267/LER-1980-004-03, /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | | | 05000267/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000267/LER-1980-005-03, /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | | | 05000267/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000267/LER-1980-006-03, /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | | | 05000267/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000267/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000267/LER-1980-007-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | | | 05000267/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000267/LER-1980-008-03, /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | | | 05000267/LER-1980-009-01, /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | | | 05000267/LER-1980-009, Forwards LER 80-009/01T-0 | Forwards LER 80-009/01T-0 | | | 05000267/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000267/LER-1980-010-03, /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | | | 05000267/LER-1980-011-03, /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | | | 05000267/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000267/LER-1980-012, Forwards LER 80-012/01T-0 | Forwards LER 80-012/01T-0 | | | 05000267/LER-1980-012-01, /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | | | 05000267/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000267/LER-1980-013-03, /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | | | 05000267/LER-1980-014-03, /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | | | 05000267/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000267/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000267/LER-1980-015-03, /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | | | 05000267/LER-1980-016, Forwards LER 80-016/03L-0 | Forwards LER 80-016/03L-0 | | | 05000267/LER-1980-016-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | | | 05000267/LER-1980-017-03, /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | | | 05000267/LER-1980-017, Forwards LER 80-017/03L-0 | Forwards LER 80-017/03L-0 | | | 05000267/LER-1980-018-03, /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | | | 05000267/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000267/LER-1980-019-03, /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | | | 05000267/LER-1980-019, Forwards LER 80-019/03L-0 | Forwards LER 80-019/03L-0 | | | 05000267/LER-1980-020, Forwards LER 80-020/03L-0 | Forwards LER 80-020/03L-0 | | | 05000267/LER-1980-020-03, During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | | | 05000267/LER-1980-021, Forwards LER 80-021/03L-0 | Forwards LER 80-021/03L-0 | | | 05000267/LER-1980-021-03, /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | | | 05000267/LER-1980-022-03, /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | | | 05000267/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000267/LER-1980-023-03, /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | | | 05000267/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000267/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000267/LER-1980-024-03, /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | | | 05000267/LER-1980-025-03, /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | |
|