Requests NRC Concurrence W/Util Plans to Perform Scale Model Recirculating Pump Tests in Lieu of in-plant Tests
ML19331C717
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/14/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GO1-80-227, NUDOCS 8008190434
Download: ML19331C717 (1)


Text

PP W shington Public Power Supply System A.CINT OPERATING AGENCY S

,o.......

3 000 c... w.......

w.,

n,c.u.

w.....ro,.

33

-o. < so.) 37s.sooo Docket Nos: 50-460 August 14, 1980 50-513 G01-80-227 Mr. B. J. Youngblood, Chief Light Water Rea-tor Project Branch No. 1 Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Youngblood:

Subject:

WPPSS Nuclear Projects Nos. 1/4 Recirculation Sump Testing

Reference:

Letter, D.L. Renberger, WPPSS to 0.D. Parr, NRC, same subject, May 15, 1979 In the reference, copy attached, we requested NRC concurrence with our plans to perform a scale model recirculation sump test in lieu of the in-plant test we committed to during the construction permit review.

Because the commitment to perform an in-plant test was only made after considerable discussion with the staff, we believe we need NRC concur-rence to forego this test.

We have not yet received any response to our request.

We would appreciate receiving NRC concurrence of our plans to perform scale model recirculating sump tests in lieu of in-plant tests as soon as possible.

Very truly yours, OM by D. L. Renberger Assistant Director - Technology DLR:AGH:oe Attachment cc:

CR Bryant - Bonneville Power Administration V Mani - United Engineers & Constructors, Inc., Phil.

S NS Reynolds - Debevoise & Liberman M

EDC Files 1/4 V

\\

JR Lewis - Sonneville Power Administration 800829o ui k

\\

N-m reb v]

Washington Public Power Supply System l

A JOINT OPERATING AGENCY S

P. O Boa 965 3000 Gao. WasesToas Way R6CMONO. WastemGTON H3 52 Pwoped 5C3 ) M 6 1611 May 15, 1979 Cocket Nos:

50 250 G01-79-303 50-513 i

Nuclear Reactor Regulation Lignt Water Reactor Project Brancn No. 3 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Olan D. Parr

Subject:

WPPSS Nuclear Projects Nos. 1 & 4 Recirculation Sumo Testinc

Dear Mr. Parr:

In response to WNP-1/4 PSAR question 6.77 and Regulatory Guide 1.79 the Supoly System committed in PSAR Amencment 15 to perform in-plant tests to d'.constrate the ability of the icw pressure injection system to circulate coolan* from the containment recirculation sump.

Since the time of that commitment we have become aware of the NRC's acceptance of scale model tests in lieu of in-plant tests.

The Supply System intends to perform model tests to verify the sump design and available NPSH. We propose to construct a model to a gecmetric scale of approximately 1:3 for these purposes.

Because the commitment to perform in-plant tests was made in response to a specific NRC request, we believe that receipt of a letter frcm the NRC approving scale model tests is approoriate before we begin to expend funds on this effort. At some later date we will be prepared to discuss with the staff the details of the proposed test program. At this time we are only requesting a letter stating that there is nothing wrong, of a general nature, in performing scale model tests in lieu of in-plant tests to satisfy our commitment in question 6.77, our commitment to paragrach C.I.b of Regulatcry Guide 1.79 including the need to verify vortex control and that cart of the available NPSH calculation concerning the screen and sump losses.

We would appreciate a reply to this request by May 25, 1979.

Very truly yours, 0~o'll Lt y D. L. Renberger Assistant Director, Technology DLR:AGH:ce cc: MS Reynolds, Debevoise i Liberman 5D Redd, United Engineers & Constructors, Inc. A bbOC

$$10 J

-