U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III E
,Jteport No. 70-36/80-03 hocketNo.70-36 License No. SNM-33 Safeguards Group III Licensee: Combustion Engineering, Inc.
Post Office Box 500 Windsor, CT 06095 Facility Name: Hematite Plant Inspection At: Hematite, Missouri Inspection Conducted: July 21-25, 1980 Date of Last Material Control and Accounting Inspection: October 23-26, 1979 Type of Inspection: Announced Material Control and Accounting Inspectors:
Ak f/y/r#
A. G. Finley
(/
Date Auditor Nf f/Y/N J. P. Patterson /
Date' Chemist 7 [O Approved By:
s A. Ifind, Chief Date
- afeguardsBranch Inspection Summary Areas Inspected: Physical Inventory, Inventory Verification, Storage and Internal Controls, Facility Organization, Records and Reports and Management of Materials Control System. The inspection involved 74 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the six areas examined during the inspection except for the following one item: Failure of the licensee on four occasions to obtain receiver signatures on internal transfers involving movement of SNM from the ICA to the MBA.
(Details Part 2.790(d) Information) suos i o 03o/..