bec to DAC:ADM:
CEt4 TRAL FlLES PDR:HQ LPOR
< - TIC
~~ '"
July 23, 1980 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
Subject:
IE Bulletin 79-03A " Weld Defects in ASME SA-312 Piping"
Reference:
- 1) Letter, K. V. Seyfrit to J. M. Pilant Dated April 4, 1980, Same Subject
Dear Mr. Seyfrit:
As required by the subject bulletin, appropriate District personnel per-formed a review of safety-related systems at Cooper Nuclear Station to determine the extent of the utilization of the subject piping.
Based upon this review, it has been determined that Cooper Nuclear Station does not utilize any SA-312 fusion welded pipe in any safety related systems nor does the District plan on utilizing this type of piping in the future.
Detailed information, relative to this review, is available at Cooper Nuclear Station.
An estimated 230 manhours of engineering time was spent researching and preparing this response.
Should you have any questions or comments regarding the above, please do not hesitate to contact me.
Sincerely, N
a
. Pilant Director of Licensing and Quality Assurance
/cmk 8008190 2 9 2