ML19331C454

From kanterella
Jump to navigation Jump to search
Forwards LER 80-035/01T-0
Date released: 12/11/2019 Download: ML19331C454


LER 80-035/01T-0:on 800727,while Operating at 100% Power, Unit Exceeded Tech Specs by 24 Mwth for 4 Days.Caused by Tube Failure in Steam Generator Blowdown Recovery Heat Exchanger 11 Resulting in Power Calculation Error
ML19331C459
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/08/1980
From: Davis S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19331C459 (2)
Forwards LER 80-035/01T-0
ML19331C453
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/08/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19331C453 (1)