__ _ - _ - _ _ - - - _ - - _ - _

1(

) V ERMONT YAN KEE NUCLEAR POWER CORPOR ATION

',(

/\\g

\\/

SEVENTY SEVEN GROVE STREET

  • h-114 Ru ri.Axo, VERMON I 05701 8

REPLY 70; ENGINEERING OFFICE TURNPIKE RO AD WESTBORO. M ASS ACHU3ETT5 01581 TELEPHONE 6,7 364-90,,

l August 13, 1980 United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Office of Nuclear Reactor Regulation Thomas A. Ippolito, Chier Operating Reactors Branch #2' Division of Licensing Refere nc e:

(a) License No. DPR-28 (Docket No. 50-271)

(b) VYNPC Letter (WVY 78-1]) to V. S. Stello, Jr. from D. E. Moody dated January 30, 1978,

Subject:

Fire Protection Information Submittal (c)- USNRC Letter to R. L. Smith from T. A. Ippolito dated July 3,1980,

Subject:

Fire Protection SER

Subject:

Shutdown Capability Analysis

Dear Sir:

g During the eighteen months that have elapsed since our submittal of the summary of our analysis of the capability to safely shutdown in the event of a fire [Refererce (b) above], criteria for that safe shutdown have been developed and promulgated. It appears that the staff reviewer has used many of these new criteria in his evaluation, then has taken Vermont Yankee to task for not responding to these criteria. We wish to point out that our response was to a requirement that the licensee " provide a summary of an analysis which demonstrates that safe shutdown systems can be placed in operation independent of fire damage to electrical circuits in either the control room, cable spreading area, or switchgear room."

At the time that our submittal was made, there existed no criteria other than our own, which were clearly stated in the submittal, and our analysis dealt with those criteria.

8008140324

j United States Nuclear Regulatory Commission August 13, 1980 Mr. Thomas A. Ippolito, Chief Page 2 It will take far longer than the -thirty days allowed in your letter for us to respond with an analysis which takes into account the new criteria for safe shutdown. As the new criteria have become a part of the proposed Appendix R to 10CFR50, we propose that we submit the analysis by whatever date is established when the rule is published in its final form.

We trust that this will be agreeable to you.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION 4