Amends 3 to CPPR-135 & CPPR-136,decreasing Percent Ownership Interest of Four Participants,Increasing Ownership Interest of Seven Participants,Adding One Participant & Reinstating One Participant as Applicant
ML19331C102
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 08/06/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19331C103 List:
References
CPPR-136-A-3, NUDOCS 8008140168
Download: ML19331C102 (6)


Text

.

b<s PUBLIC SERVICE CCMPANY OF NEW HAMPSHIRE THE UNITED ILLUMINATING COMPANY CENTRAL MAINE POWER CChPANY CENTRAL VERMCT:T PUBLIC SERVICE CORPORATICN FITCHBURG GAS AND ELECTRIC LIGHT COMPAt;Y MONTAUP ELECTRIC COMPANY NEW BEDFORD GAS AND EDISON LIGHT COMPANY NEW ENGLAND POWER COMPANY TOWN OF HUCSON, MASSACHUSETTS, LIGHT AND POWER DEPARTMENT VERMONT ELECTRIC C00PERATfk', It.C.

BANGOR HYORO-ELECTRIC CC PANY TAUNTON MUNICIPAL LIGHilNG PLAN T MMISSION MASSACHUSETTS MUNICIPAL WHOLESALE TLETTRIC CCMPANY MAINE PUBLIC SERVICE COMPANY DOCKET NO. 50-443 SEABR00K STATION, UNIT 1 AMENDMENT TO CONSTRUCTION PERMIT Amendment No. 3 Construction Permit No. CPPR-135 1.

The Nuclear Regulatory Commission (the Commission) having found that:

A.

Tne application for amendment contained in a letter, dated May 16, 1979, and amended by letter dated March 14, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as-amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; C.

The following is financially qualified to assume its ownership interest in the Seabrock Station, Unit 1, shown below:

New Hampshire Electric Coop. Inc.

2.17391

[ Sum:

2.17391];

D.

Each of the following is financially qualified to increase its percent cwnership interest in the Seabrook Station, Unit 1, shown below:

Central Maine Pcuer Company to 6.04178 from 2.54178 1

Montaup Electric Company to '3.96458 from 2.93531 Montaup is financially qualified to increase its ownership percentage to 5.00000 by an additional transfer of 1.03542 cenership percentage from the Connecticut Light and Power Company, but authorization is withdrawn pending confirmation that transfer will be consumated.

.8008140 bg

. The Connecticut Light and Power Company to 4.493172 from 0.00000 Town of Hudson Light and Power Department to 0.07737 frca 0.05780 Massachusetts Municipal Wholesale Electric Company.

to 11.59340 from 5.59249 Bangor Hydro-Electric Company to 2.17391 from 0.37249 Taunton Municipal Lighting Plant c.o 0.43479 from 0.10034

[ Sum: to 28.779 from11.60021];

E.

After the transfer of ownersnip interests is completed, the percent ownership interest (shown below) for each of the following will be equal to or less than its original percent cunershir interest as amended by Amendments 1 and 2 (shown in parentheses) in the Seabrook Station, Unit 1.

(The percent ownership interests shown in 1.C, 1.D, and 1.E add up to one hundred percent).

Public Service Company of New Hampshire 35.23497 (50.00000)

The United Illuminating Company 16.43531 (20.00000)

New England Power Company 9.95766 ( 9.95766)

New Bedford Gas & Electric Lighting Company 3.52317

( 4.37370)

Central Vermont Public Service Corporation 1.59096 3 (( 0.60432) 1.59096)

Fitchburg Gas & Electric Light Company 0.43187 Vermont Electric Corporative, Inc.

0.41259 ( 0.41259)

Maine Public Service Company 1.46056 ( 1.46056)

[ Sum:

69.04709 (88.39979)] ;

F.

Prior public notice of this amendment is not required since the amendment does not involve a significant hazards consideration.

J 2.

Accordingly, Construction Permit flo. CPPR-135 is amended to reflect a change in the ownership of the facility by adding tiew Hampshire Electric Coop., Inc., and by transferring ownership interests as follows:

A.

The following paragraph (3.F.) is added to the construction nermit:

3.F The following percent ownership interests may be transferred from Transferors to Transferees:

To: Central Maine Pcwer Company 2.50000 Montaup Electric Company 1.06469 3.56469 2 Retained from original ownership share of 11.9776 instead of being transferred as contemplated under Amendment flo.1 Eitchburg is financially qualified to increase its cunership' percentage to 0.86159 by an additional transfer of 0.43332 ownership percentage from Connecticut Light and Pcwer Company, but authorization is withdrawn pending confirmation that the transfer will be consumated.

. From: United Illuminating Ccapany 56469 To: 14assachusetts Punicipal Wholesale Electric Company 6.00091 New Hampshire Electric Ccoperative, Inc.

2.17391 New Bedford Gas & Edison Light Ccmpany 2.17390 Bangor Hydro-Electric Company 1.80142 Montaup Electric Company 1.00000 Central Maine Pcwer Ccmpany 1.00000 Taunton Municipal Lighting Plant Cormiission 0.33445 Fitchburg Gas & Electric Light Company 0.26037 Tcun of Hudsen Light & Pcwer Ccmpany 0.01957 14.76503 Frcm: Public Service Company of :;ew Hampshire 14.76503 To: The Connecticut Light and ?cuer 4.49317" Ccapany (shares new retained

~

even though transfer was authorized by Amendment No. 1)

Frcm: New Bedford Gas & Edison Light Cenpany 3.02443 Fitchburg Gas & Electric Light Company 0.43332 Itentaup Elactric Comapny 1.03542 S.

In all references in Ccnstruction Permit fio. CPPR-135 to " applicants" include:

The Connecticut Light and Power Ccapany New Hampshire Electric Coop., Inc.

3.

This acendment is effective as of the date of issuance.

FOR THE f;UCLEAR REGULATORY COM'11SSION 0 tO Awz w-3/DarrellG.Eisenfrut, Director U

Division of Licensing Office of I uclear Reacter Regulation

'Date of Issuance: p.uG 0 $ 1530

Autnorizatien of these transfers in effect withdraws the authcrizaticn of Amandment tio. I for the reverse transfers. The proposed transfer of 3.02443 percent frca Connecticut Light and ?cwer Company to ?!ew Bedford authorized by Amendment ::o. I was cancelled by ::ew Bedford. '!erificatien of the preposed transfer frem Connecticut Light and ?ct:ar to Fitchburg of_0'.43332 percent and to Montaup of 1.03542 percent was withdrawn by Supplement 4 to Amendment 40 to the applicaticn.

~

PUBLIC SERVICE COMPANY OF f!EW HAMPSHIRE THE UNITED ILLUMINATING COMPANY CENTRAL MAlttE PC;;ER CONPANY CENTRAL VERMONT PUBLIC SERVICE CORPORATION FITCHBURG GAS AND ELECTRIC LIGHT COMPAi1Y MONTAUP ELECTRIC COMPAtlY NEW BEDFORD GAS AND EDISON LIGHT CCMPANY NEW ENGLAtiD POWER COMPANY TOWN OF HUDSON. f1ASSACHUSETTS, LIGHT AND POUER DEPARTMENT VERMONT ELECTRIC COOPERATIVE, It:C.

BANGOR HYORO-ELECTRIC COMPANY TAUNTON MUNICIPAL LIGHTING PLANT CCMMISSI0ft MASSACHUSETTS MUNICIPAL WHOLES /LE ELECTPIC COMPAftY J

MAINE PUBLIC SERVICE COMPAtY DOCKET N0. 50-444 SEAER00K STATI0ft, UtlIT 2 AMENDNENT TO CONSTRUCTION PERMIT Amendment No. 3 Construction Permit flo. CPPR-136 1.

The Nuclear Regulatory Ccmmission (the Commission) having fcund that:

A.

The application for amendment contained in a letter, dated taay 16, 1979, and amended by letter dated March 14, 1930, ccmplies with the standards and requirements of the Atomic Energy Act of 1954, as

~

amended, and the Commission's rules and regulations set forth~ in 10.CFR Chapter I; 8.

The issuance of this amendment will not be inimical to the common defense and security or to the, health and safety of the public; C.

The following is financially qualified to assume -its ownership interest in the Seabrook Station, Unit 2, shown below:

New Hampshire Electric Coop. Inc.-

2.17391

[ Sum:

2.17391];

D.

Each of the following is financially qualified to increase its percent ownership interest in the Seabrook Station, Unit 2, shown below:

Central Maine Power Company to 6.04178 feca 2.54178 Montaup Electric' Company to-3.9645El from 2.93531

'Nontaup is financial!y qualified to increase;its ownership percentage to 5.00000 by _ an additional transfer of 1.03542 ownership percentage from the Connecticut Light and Power Company, but authorization is withdrawn pending confirmation that transfer will be consumated.

i

. The Connecticut Light and Power Company to 4.493172 from 0.00000 Town of Hudson Light and Power Department to 0.07737 from 0.05780 Massachusetts Municipal Wholesale Electric Company to 11.59340 frcm 5.59249 Bangor Hydro-Electric Company to 2.17391 from 0.37249 Taunton Municipal Lighting Plant to 0.43479 frcm 0.10034

[ Sum: to 28.779 from 11.600213; E.

After the transfer of ownership interests is completed, the percent ownership interest (shown below) for each of the following will be equal to or less than its original percent ownership interest as amended by Amendments 1 and 2 (shown in parentheses) in the Seabrook Station, Unit 2.

(The percent ownership interests shown in 1.C.

1.D, and 1.E add up to one hundred percent).

Public Service Company of flew Hampshire 35.23497 (50.00000)

The United Illuminating Company 16.43531 (20.00000)

New England Power Company 9.95766 ( 9.95766)

New Bedford Gas & Electric Lighting Company 3.52317 ( 4.37370)

Central Vennent Public Service Corporation 1.59096 3 (( 0.60432) 1.59096)

Fitchburg Gas & Electric Light Company 0.43187 Vermont Electric Corporative, Inc.

0.41259 (0.41259)

Maine Public Service Company 1.46056 ( 1.46056)

[ Sura:

69.04709 (88.39979)];

F.

Prior public notice of this amendment is not required since the amendment does not involve a significant hazards consideration.

2.

Accordingly, Construction Permit No. CPPR-136 is amended to reflect a change in the ownership of the facility by adding New Hampshire Electric Coop., Inc., and by transferring ownership interests as follows:

A.

The following paragraph (3.F.) is added to the construction permit:

3.F The following percent ownership interests may be transferred from Transferors to Transferees:

To: Central Maine Power Company 2.50000 Montaup Electric Company 1.06469 3.5c469 2Retainett from original ownership share of 11.9776 instead of being transferred as contemplated under Amendment No.1 2Fitchburg is financially qualified to increase its ownership percentage to 0.86159 by an additional transfer of 0.43332 ownership percentage from Connecticut Light and Pcwer Company, but authorization is withdraun pending confinnation that the transfer will be consumated.

. From: United Illuminating Company 3.56469 To: Massachusetts Municipal Wholesale Electric Company 6.00091 New Hampshire Electric Cooperative, Inc.

2.17391 New Bedford Gas & Edison Light Company 2.17390 Bangor Hydro-Electric Company

~

1.80142 Montaup Electric Company 1.00000 Central Maine Power Company 1.00000 Taunton fiunicipal Lighting Plant Commission 0.33445 Fitchburg Gas & Electric Light Company 0.26087 Town of Hudson Light & Pcwer Company 0.01957 14.76503 From: Public Service Company of flew Hampshire 14.76503 To: The Connecticut Light and Power 4.493174 Company (shares now retained even though transfer was authorized by Amendment No.1)

From: _ flew Bedford Gas & Edison Light Company 3.02443 Fitchburg Gas & Electric Light Company 0.43332 Montaup Electric Comapny 1.03542 B.

In all references in Construction Permit No. CPPR-136 to " applicants" include:

The Connecticut Light and Puwer Company New Hampshire Electric Coop., Inc.

3.

This amendment is effectise as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION 1ppf&}mjx D

Darrell G. Eisenhut, Director

/

/

Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance: AUG 9 S 1930

" Authorization of these transfers -in effect withdraws the authorization of Amendment No. I for the reverse transfers.

The proposed transfer of 3.02443 percent from Connecticut Light and Power Company to New Bedford authorized by Amendment No. I was cancelled by New Bedford. Verification of the proposed transfer from Connecticut Light and Power to Fitchburg of 0.43332 percent and to Montaup of 1.03542 percent was withdrawn by Supplement 4 to Amendment 40 to the application.