Alac ma Power Company 600 North 18:n Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 F. l CLAYTON, JR.
sen.or v ce Pres.oent Alabama Power August 7, 1980
- ne gournem eiectre sys:em Docket No. 50-348 No. 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Attention: Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 DEGRADED ELECTRICAL POWER GRID CONDITIONS Gentlemen:
Our letter to you dated July 30, 1980, described Alabama Power Company's proposed test on Farley Unit 2 based upon our understanding of what had previously been agreed upon to satisfy the NRC Staff Position 4 on this subject. The test as described did not include the loading of any non-1E equipment on Startup Transformer 2B, but explained that the safeguards loads would represent approximately 17% of the total load due to a unit trip with a safety injection. Subsequently, in a conference call between the NRC Staff and Alabama Power Company repre-sentatives,the Staff stated that in order for the test to satisfy the Position 4 requirements, some of these non-1E loads should be included in the test.
A conference call was arranged on August 5 between Alabama Power Company representatives and the NRC Staff to resolve this item. The Staff stated that the proposed test would be acceptable if, in addition to the train B safeguards loads, the circulating water pump load on 4160V Bus 2A is included in the test. APC0 concurred and stated that this will be done. The resulting total load on Startup Transformer 2B will be approximately 38% of the total load due to a unit trip with a safety injection. The attached figure replaces the one included in the July 30 letter and depicts the revised proposed test lineup.
It is Alabama Power Company's position that the revised proposed test will satisfy the NRC Staff Position 4 requirements.
In regard to Unit 1, Alabama Power Co.npany stated that justification will be provided that the results of the Unit 2 test are also applicable to Unit 1 due to the similarity of design for both units. This justi-fication will be provided after the Unit 2 test results have been
/
analyzed and prepared for submittal to the NRC.
S Ifl 6h Y
[
8008130
w TO: Mr. A. Schwencer. August 6, 1980 Should you have any furtner questions, please advise.
Yours very truly, W,h. [ '
h A,[c
'F.'L. Clayton,jdr.
TLC /rt Enclosures cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. E. i'.eeves Mr. W. H. Bradford Mr. S. A. Varga I
1 l
2 3 0 KV Svsrs n g, lg (Nea IE)
'50 T aasr. ""
.28 cm
- B us 2 E (Ne=- IE B<ss)
^
cn
- - CW Pune 2A o n--> Bus.2F (Acr. Fsso)
'^
cm
> C C W Pu n e.2 A
'^
"I'* #
> CCW Pune 2.8 Bus 2L (KW,KVAR
', n
- - C ns. Pune 2.8
- Cu c. Pune.2C cm
. S y p,,,
2 y
> RHR P.n o
.2 B
'^
'^
t AFw Pune 2B
- .S W Pur.o 2E
^
> CT*.r. SPWAv Pone 2B Fas.h >c
'^
> R u Pune 4 cm
^
n R u P-ne.s*
em Nuov aus 21
- wA
'^
guo v-
> Barr. Cua. 2 8 ac ev~ m Bus 2G C"
y C,n r. C.,s s e
^
M C7eir. (sots 4
^
(RW, vvA R
>LC2c
- C Lrc. Pausss + 0rusa Laan
'^
(KW, KVAR
- ^
>MCC lC
- CR \\/terouro.u + 6rasr L. ass
'^
M C C 2 B+ 3 fuenarsas + orasa Laass
, ' ^
> M C C l bD-+ A Lre. Paan s + Oran L.au
> Mct 2 v-+ M o v 's em C - Baunes Cross a
\\
400 V-
> Re.n Faa o - Ba u ssa o rsu LC 2E
^
- R..., ra u
( KW,KVA R em
> D. C. Roan Hursa
- h.c. R..
n a raa
'^
coo a l
wD DEGRADEb 0 Rib YoLrAGt Stub 4 W^
2094^'
Tes r Coaracu< arson ra ssr,s ev
> Lre. Paan s.
NRC Pasoroon
't m cc.:tr Rev sea r-c-m J K