ML19331B720

From kanterella
Jump to navigation Jump to search
Amend 45 to DPR-31,allowing Licensee to Proceed W/Mods in Paragraphs 3.1.1 Through 3.1.19 of NRC Fire Protection Safety Evaluation.Mods Should Be Completed Prior to Dec 1980
ML19331B720
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/21/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
References
FOIA-80-303 NUDOCS 8008120662
Download: ML19331B720 (2)


Text

y.

/

  • (f ~ ~m o e rmee

'?

l UNITED 5T ATES NUCLEAR REGULATORY CO*AMtsslON "r

[

3..

W ASWNGTON. C :.20555

's *b5$j. )

IL /.E l

fl g,

j FLORIDA POWER AND LIGHT COMPANY _

DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING STATION U AMEN 3 MENT TO FACILITY OPERATING LICENSE Amendnent 'fo. 45 License No. DPR-31 The Nuclear Regulatory Commission (the Commission) has found th 1.

The application for amendnent by Florida Power and Lightas supplene 22, 1977 Company (the licensee) dated Decemberon June 5 and complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 9

The facility will operate in conformity with the application, the' provisions of the Act, an'i the rules and regulations of B.

the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without C.

endangering the health and safety of the public, and (ii) that such activities will be conducted in cor.pliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and D.

safety of the public; and The issuance of this amendment is in accor E.

requirements have been satisfied.

8 0 08120 66b

/-

((

(

3

/.

2.

Accordingly, the license is amended by adding paragraph 3.G.

f Operating License No, DPR-31 is hereby amended to read as follows: Facili (G )

Fire Protection The licensee may proceed with and is required to provide a schedule for and to complete the modifications identified in Paragraphs 3.1.1 through 3.1.19 of the NRC's Fire Protection Safety Evaluation, cated March 21, 1979 for the facility.

'These modifications are to be completed prior to December 1980 7

If any modifications cannot be completed on schedule the licensee shall submit a report explaining the circumstances together with a revised schedule.

In addition, the licensee shall submit the additional information identified in Sections 3.1 and 3.2 of the related Safety Evaluation in accordance with the schedule contained therein.

In the event these dates for submittal cannot be met, the circumstances, together with a revised schedule.the licen The licensee is required to develop and implement the administrative and November 7,1978 within three months from the d this amendment.

3.

This license amendment is effective as of the date of its issu F0R THE NUCLEAR REGULATORY C0t1MISS10N

{'.f. r'p. p //./(4 / Y ! V 6

A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors l

Date of Issuance: March 21,1979 l

i l

l

.