ML19331B712

From kanterella
Jump to navigation Jump to search
Forwards LER 79-106/01T-1
Date released: 12/11/2019 Download: ML19331B712


LER 79-106/01T-1:on 791112,while Performing Calculations for IE Bulletin 79-02,11 Seismic Hangers Found Not as Conservative as Required by Design Criteria.Caused by Design Errors by Itt Grinnell in Initial Calculations
ML19331B716
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/23/1979
From: Batch S, Dieterich K
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19331B716 (1)
Forwards LER 79-106/01T-1
ML19331B711
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/07/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19331B711 (1)