Responds to NRC 800702 Request for Proposed Tech Specs for Category a Lessons Learned Items.Changes Will Be Submitted Following Issuance of Unit 2 OL Scheduled for Sept 1980
ML19331B675
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/07/1980
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8008120571
Download: ML19331B675 (1)


Text

A' Mama Power Company e o, Nortn 18th Street Rat OfficJ Box 2641 Birmingham. Alabama 36291 i

Telephone 205 250-1000 h-F. L CLAYTON, JR.

Senior Vice President Alabama Power the southem electrc system August 7, 1980 Docket No. 50-348 Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Mr. D. G. Eisenhut Gentlemen:

RE: Letter from D. G. Eisenhut to All Pressurized Water Reactor Licensees, Dated July 2, 1980 The referenced letter requested that Alabama Power Company propose technical specifications for category A lessons learned items for Farley Unit 1.

The letter also requested proposed license conditions related to a system integrity measurements program and improved iodine measure-ments capability for Farley Unit 1.

The above information was requested to be submitted to the NRC within sixty (60) days of receipt of the referenced letter.

Since Farley Unit 2 is scheduled to receive an operating license in September, 1980, Alabama Power Company plans to submit the requested Farley Unit 1 changes af ter the Unit 2 license is issued to assure that the same wording is used in both operating licenses and technical specifications.

If you have questions, please advise.

Yours very truly, d

V

'% 6 g F. L. Clayton, Jr.

FLCJr/TNE:bhj N

cc:

Mr. R. A. Thomas O

Mr. G. F. Trowbridge 3

Mr. L. L. Kintner Mr. W. H. Bradford

//

Mr. Ed Reeves 8 0 0812() bj7l f

i