ML19331B675
| ML19331B675 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/07/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8008120571 | |
| Download: ML19331B675 (1) | |
Text
A' Mama Power Company e o, Nortn 18th Street Rat OfficJ Box 2641 Birmingham. Alabama 36291 i
Telephone 205 250-1000 h-F. L CLAYTON, JR.
Senior Vice President Alabama Power the southem electrc system August 7, 1980 Docket No. 50-348 Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. D. G. Eisenhut Gentlemen:
RE: Letter from D. G. Eisenhut to All Pressurized Water Reactor Licensees, Dated July 2, 1980 The referenced letter requested that Alabama Power Company propose technical specifications for category A lessons learned items for Farley Unit 1.
The letter also requested proposed license conditions related to a system integrity measurements program and improved iodine measure-ments capability for Farley Unit 1.
The above information was requested to be submitted to the NRC within sixty (60) days of receipt of the referenced letter.
Since Farley Unit 2 is scheduled to receive an operating license in September, 1980, Alabama Power Company plans to submit the requested Farley Unit 1 changes af ter the Unit 2 license is issued to assure that the same wording is used in both operating licenses and technical specifications.
If you have questions, please advise.
Yours very truly, d
V
'% 6 g F. L. Clayton, Jr.
FLCJr/TNE:bhj N
cc:
Mr. R. A. Thomas O
Mr. G. F. Trowbridge 3
Mr. L. L. Kintner Mr. W. H. Bradford
//
Mr. Ed Reeves 8 0 0812() bj7l f
i