Forwards Monthly Operating Rept for Jul 1980
ML19331B673
Person / Time
Site: Humboldt Bay
Issue date: 08/04/1980
From: Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19331B674 List:
References
NUDOCS 8008120570
Download: ML19331B673 (1)


Text

_..

PACIFIC OAS AND E LE C T RIC C O M PANY IPGWS

-y-17 BE ALE STREET

  • SAN FRANCISCO, CALIFO ANI A 94106-(415) 7814211
  • TWX 910 372 6587 ames,,ogsgreEn DEPARTMENT JF NUCLEAR P(ANT OPERATCNS NUCLE AR POWER QENERAT(JN August 4, 1980 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for July,1980. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Technical Specifications.

[

Sincerely,

[ h, 2

E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc:

Mr. J. D. Shiffer Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office U. S. Nuclear Regulatory Commission d

1990 N. California Boulevard fl S Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596

//

EDWeeks:me soosuo 57o (71.

MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report desc'ribes the operating and major maintenance experience for the month of July 1980. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:1.1.c. of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation. There were no significant events associated with the operation of the Unit. There was no significant maintenance completed during the month.