ML19331B633

From kanterella
Jump to navigation Jump to search
Forwards LER 80-016/01T-0
Date released: 12/11/2019 Download: ML19331B633


LER 80-016/01T-0:on 800717,reanalysis by Bechtel of as-built Piping Determined That Stresses on Snubber 3-10-GB-S-44 Exceeded Operability Criteria.Caused by Inadequate Design Due to as-built Condition & Seismic Analysis Info Variance
ML19331B639
Person / Time
Site: Peach Bottom 
Issue date: 07/31/1980
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19331B639 (1)
Forwards LER 80-016/01T-0
ML19331B632
Person / Time
Site: Peach Bottom 
Issue date: 08/04/1980
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19331B632 (2)