. _ _ _ _ _ _ _
THIS DOCUMENT'CONTAINS hM P00R QUAUTY PAGES
'l
.l?
UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD-In the Matter of
)
)
7 CONSUMERS POWER COMPANY
)
Docket Nos. 50-329
)
50-330 (Midland Plant, Units 1 and 2)
)
AEC REGULATORY STAFF'S MOTION FOR AN EXTENSION OF TIME TO FILE REPORT, COMMENTS AND OTHER INFORMATION REQUIRED BY ALAB-132
\\
On June 28, 1973, the Atomic Safety aAd Licensing Appeal Board issued in
~
..this proceeding a Memorandum and Order (ALAB-132) which directed the AEC Regulatory Staff either (a) to file within 10' days of the date of ALAB-132 a report of any full-field inspection of the Midland Plant conducted subsequent to March 26, 1973, or, in the event no full-field inspection had been conducted since March 26, (b) to conduct such an inspection within 30 days of the date of ALAB-132 and to report to the Appeal Board within 10 days after completing the inspection. The Appeal Board also directed the staff to include in the fore-going report all of the information called for by Condition 2 of ALAB-106, as of the date of the report, and to provide with the report staff comments on the applicant's previously filed report to the Appeal Board pursuant to Condition 1 of ALAB-106.
sconso EM
\\
i
,l'
~
, A full-field inspection of the Midland Plant was conducted by the staff on June 26-28,1973. Pursuant to ALAB-132 the staff is required to submit its report on the inspection within 10 days of June 28, 1973, the date of ALAB-132. However, since the tenth day, July 8,'is a Sunday, the report is actually due on Monday, July 9,1973.
As a result of our evaluation of the effort required of the staff to meet the requirements of ALAB-132 and the staff rekources available for that effort, we are requesting an additional nine working days to comply with the directives of ALA3-132. In support of this request, we note that, in the ordinary course of business, the preparation and issuance of an inspection report typically spans a period of about three weeks, and that the effort here required clearly involves more than the preparation of an inspection report. Furthermore,
the short period now available for preparation of the staff's report and comments is divided by a national holiday, July 4th.
The Appeal Board should also be aware that resumptMn of full-scale construction at the 'didland site has not occurred. The work force at the site comprises approximately fifty individuals who are engaged in a variety of activities -- such as, for example, removing concrete forms, requalifying materials, and reconstituting the concrete batch plant -- the general purpose of which is simply to prepare the site for the resumption of full-scale construction.
_ 3 For the foregoing reasons, the AEC Regulatory Staff moves the Atomic Safety and Licensing Appeal Noard for an order extending by nine working days (i.e., until July 20,1973) the latest date for the submission of the report, comments and other information required of the staff by ALAB-132.
Respectfully submitted.
T.9/
David E. Kartalia Counsel for AEC Regulatory Staff
- Dated at Bethesca, Maryland this 3rd day of Ju.f,1973 9
9 e
I
,t UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of
-)
)
CONSUMERS POWER COMPANY
)
Docket Nos. 50-329
)
50-330 (Midland Plant, Units 1 and 2)
)
CERTIFICATE OF SERVICE I hereby certify that copies of "AEC Regulatory Staff's Motion for an Extension of Time to File Report, Comments and other Information Required by ALAB-132",.
dated July 3,1973
.n the captioned matter, have been served on the following by deposit in the United States mail, first class or airmail, this 3rd day of July, 1973:
Alan S. Rosenthal, Chairman Arthur W. Murphy, Esq., Chairman Atomic Safety and Licensing Appeal Atomic Safety and Licensing Board Board Columbia University School of Law U. S. Atomic Energy Commission Box 38 Washington, D. C. 20545 435 West 116th Street, New York, New York 10027 Dr. John H. Buck Atomic Safety and Licensing Appeal Dr. David B. Hall Board Los Alamos Scientific Laboratory U. S. Atomic Energy Commission P. O. Box 1663 Washington, D. C. 20545 Los Alamos, New Mexico 87544 William C. Parler, Esq.
Dr. Clark Goodman Atomic Safety and Licensing Appeal Professor of Physics Board University of Houston U. S. Atomic Energy Commission 3801 Cullen Boulevard Washington, D. C.
20545 Houston, Texas 77004 Howard J. Vogel, Esq.
Harold Reis, Esq.
Knittle and Vogel Newman, Reis 'and Axelrad 814 Flour Exchange Building -
1100 Connecticut Avenue, N. W.
310 Fourth Avenue South Washington, D. C. 20036 Minneapolis, Minnesota 55415 v
w,
,x Irving Like, Esq.
James A. Kendall, Esq.
Reilly, Like and Schneider 135 N. Saginaw Road 200 West Main Street Midland, Michigan 48640 Babylon, New York IL702 David Comey, Esq.
Harold P. Graves, Esq.
109 North Dearborn Street Vice President and General Counsel Suite 1001-Consumers Power Company Chicago, Illinois 60602 -
212 West Michigan Avenue Jackson, Michigan 49201 Honorable Vern Miller Attorney General Milton R. Wessel, Esq.
Topeka, Kansas 66601 Kay, Scholer, Fierman, Hays and Handler Richard G. Smith, Esq.
425 Park Avenue Smith and Brooker, P.C.
\\ 703 Washington Avenue
' Bay City, Michigan 47806 James N. O' Conner The Dow Chemical Company Atomic Safety and Licensing Board 2030 Dow Center Panel Midland, Michigan 48640 U. S. Atomic Energy Commission Washington, D. C. 20545 Ms. Mary Sinclair 5711 Summerset Street Atomic Safety and Licensing Appeal Midland, Michigan 48640 Board U. S. Atomic Energy Commission Honorable William H. Ward Washington, D. C. 20545 Assistant Attorney General Topeka, Kansas 60601 Mr. Frank W. Karas Chief, Public Proceedings Staff Myron M. Cherry, Esq.
Office of the Secretary of the Jenner and Block Commission One IBM Plaza U. S. Atomic Energy Commission Chicago, Illinois 60603 Washington, D. C.
20545' William J. Ginster Esq.
Suite 4 Merril Building Saginaw, Michigan 48602 2l
[
$ 64 David E. Kartalia Counsel for AEC Regulatory Staff
.