Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML20153C9461988-08-0404 August 1988 Requests Assurance from NRC That Allowing above-ground Storage of Dry Spent Fuel Would Not Decrease Safety of Public ML20084K3751984-05-0202 May 1984 Informs That Intervenors Govt Accountability Project,Lone Tree Council & M Sinclair Do Not Represent Midland Community.Great Majority of Midlanders Want Nuclear Plant Completed & Operating ML20087F6941984-02-0707 February 1984 Notifies That Util Seeking Ratemaking Treatment for Plant. Engineering Consultants Hired to Prepare Testimony Re Operation Date,Cost & Generating Capacity ML20024C9701983-07-0808 July 1983 Requests Available Nontechnical Info Re Problems W/ Engineering Design/Specs & or Implementation of Engineering Work for Plants ML20072H6191983-03-22022 March 1983 Requests to Testify at 830329 Hearings ML20058E3731982-07-21021 July 1982 Submits Merb Subcommittee Rept on Draft Eis.Evacuation Plan for Dow Facility Inadequate.Fogging Issue Needs Clarification ML20050D3431982-04-0101 April 1982 Comments on Des Re Operation of facility,NUREG-0537.Radwaste Sys & Plant Emergency Response Plan Will Be Addressed in SER Scheduled for Completion in May 1982.Soil Stability Should Be Addressed in Fes ML20050A5951982-03-26026 March 1982 Forwards Comments Re Critical Areas of Des.Requests Hearings on Des Immediately ML19350E3301981-06-0808 June 1981 Requests That Gt Taylor Be Deleted from Svc List.Sh Freeman Should Be Substituted ML19254D0311979-08-15015 August 1979 Ack Receipt of 790723 Notice Advising That Prehearing Conferences Will Be Held Re Steam Generator Removal & Replacement at Facility.Requests Advance Notice of Issues to Be Discussed to Determine Necessity of Attendance ML19259C5661979-05-30030 May 1979 Opposes Delay in OL Review Process ML19347A6171979-05-30030 May 1979 Forwards Context of 790529 Telegram to NRC Supporting Licensing of Facility ML19330A1581979-05-30030 May 1979 Discusses Possible Interruption of Facility Licensing Process Based on Staffing Limitations,Not Safety Issues. NRC Personnel marked-up Comments Encl.Requests Action Be Reconsidered ML19242C7361979-05-29029 May 1979 Opposes Delay in Operating Licensing Review Process.Stresses That Delay Will Cause Cost Overruns & Increased Consumer Rates.Urges Reconsideration of NRC Position ML19261E2141979-05-29029 May 1979 Summarizes 790529 Telex to Jm Hendrie.Requests NRC Review Assessment of Operating Schedule Before Taking Action on Interrupting Review Process ML19347A6191979-05-29029 May 1979 Opposes Delays to OL Review Due to Increase in Overall Const Cost & Costs of Electrical Power to Ratepayers.Best Available Evidence Should Be Employed in Allocation of Resources.Certificate of Svc Encl ML19261E2111979-03-30030 March 1979 Forwards Summary of 790529 Telex to Jm Hendrie Re Interruption of OL Review Process ML20064H7251978-11-28028 November 1978 Forwards Participation in the Instant Proc. W/Cert of Svc ML19331A9771976-11-0808 November 1976 Refers to 761116 Hearing Scheduled at Holiday Inn.Eight Organizations from Midland Request Limited Appearances.Govt Units & Organizations Will Speak on socio-economic Impact on Community,If Const Delayed as Result of Hearing ML19331B1421974-11-0808 November 1974 Requests Response to Questions Re Const of Plant in View of Law Suit Brought by Licensee Against Bechtel for Negligent Design & Const of Palisades Plant.Requests to Be Kept Informed on Continuing Basis ML19331A3601972-09-0808 September 1972 Forwards Statement of Fj Kelley,Atty General of State of Mi Re Order to Show Cause for Contempt Involving Mm Cherry ML19329F6221972-02-10010 February 1972 Approves Des ML19329F6231972-02-0909 February 1972 Accepts Des & Expands Paragraph Re Widening of Poseyville Road ML19329F6241972-02-0808 February 1972 Provides Comments Re Des ML19329F6251972-02-0808 February 1972 Discusses Financial,Ethical & Educational Aspects of Plant Site in School District.Plant Will Benefit Area W/Proper Environ & Safety Protections ML19331A4931971-10-15015 October 1971 Warns of Adverse Effects of Delay in CP Issuance & Stresses That Delay Past Dec 1971 Will Jeopardize Entire Project. Identical 711015 Ltr to President Nixon Encl ML19331A4971971-10-13013 October 1971 Urges Prompt Action on CP Issuance to Ensure Desperately Needed Electrical Power to Mi & Dow Chemical,Major Local Employer.Identical 711013 Ltr to President Nixon Encl ML19331A5021971-10-13013 October 1971 Urges That Licensing Hearings Be Promptly Reconvened & Stresses State of Mi Need for Addl Sources of Electric Power.Certificate of Svc Encl ML19344A2611971-08-26026 August 1971 Requests Info Re Revised Regulations That Might Be Relevant to Proposed Intervention in Proceedings Involving Util Project at Midland,Mi ML19330A0221971-06-0202 June 1971 Requests Withdrawal from Midland Proceeding & Deletion from Mailing List.Certificate of Svc Encl ML19329F7031970-11-25025 November 1970 Advises That Mi Public Svc Commission Will Be Represented at ASLB 701201 Hearing Re Limited Appearance Statement. Certificate of Svc Encl ML19329F7011970-11-25025 November 1970 Requests Limited Appearance at ASLB 701201 Hearing on Behalf of Dept of Natural Resources.State of Mi Dept of Commerce 701125 Ltr Encl 1988-08-04
[Table view] |
Text
. - r. - ~w; .-~.;- - ~ -- - ---
~**-4--"-
~
i ~
, , l ' , . ;, l :.h ', :
' ~
4%+.*$ '" dk,.l. m
. . . n .c. ; . . . : - y w . ~ . - - ~ s n. .
-. r. ,r-w- -. .s~., =~**i
- s. t-+ > <svN*.C. 4.%w a.eevee== eses enset.ine eerscasaors . n sa . * * -
. _. ._ _ _ _ m u .x.;_ _.= -. - a _ - - - - - - - - - - -
FROM .4 -
CONT ROL' NUMBE R FILE LOCATION State of Michigan, Dept. of Commerce. , 787J, Public Service Commission '
'oATE OF DOCUMENT ACTION COMPLETION DEAOLINE Wm. G. Rosenberg 11/8/74' 11/27/74 To ,
ACTION PROCES$1NG DATES PREPARE Ft1 SIGN ATURE OFr
AcknowiUged Chairmen Chairman ~1- ,
Interire Reply Director of Regulation
, ,,,,i-
. . . -X Giambusso .
DESCRIPTION btr Misines O Ce,r - ' Ooh C
" "8
,,(~
Req response to questions concerning construction of the ), ,
Midland plant in view of the law su.it brought by Consumers Power against Bechtel for negligent-~ design &' construction of , .
the Palisades plant and requests :to-be kept . informed on a continuing basis ,Ta?
' c ._
.w - -
' W.rdSECY~75-1630 .-
\ l REFERRED To DATE is NOTlPICATION TO THE JCAE j RECOMMENDED 7"'
Giambusso f/ action 11/19/74 -2
Cy.y.Muntzing Docket Tilen ) 50-255 /
Gossick PDR ) 50-329-Case '
LPDR (2) ) 50-330 Knuth Shapar DO NOT DETACH THIS COPY DIRECTOR OF REGULATION Form NQ 32 (173)
COMMUNICATION 5 ' CONTROL USAEC THIS DOCUMENT CONTAINS P00R QUAUTY PAGES 8007250 [3y
STATE OF MICHIG AN fuBLIC SERVICE COMMISSION w f William G. Rosenberg, Chairman
! Lenton G. Scutthorp William R. Ralls WILLI AM G. MILLIKEN, Governor DEPARTMENT OF COMMERCE LAW BUILDING, LANSING, MICHIGAN 48913 RICHARD K. HELM 8RECHT, Director November 8, 1974 o 32
<- ?E
-c 73 Ei __
D7 Honorable Dixie Lee Ray E' h.?:
Chairman ';.1 at ~1 U. S. Atomic Energy Commission E
-~
Washington, D.C. 20545 gj :: a
-4 ..
Dear Chairman Ray:
[j j[
On August 28, 1974, Consumers Power Company, a utility regulated by this Commission, brought a lawsuit in Federal District Court, Grand Rapids, Michigan, against defendants which include th.e Bechtel Corporation and the Bechtel Company. Consumers Power alleges damages of at least $300 million due to negligent acti-vities by the defendants in the design and construction of the
, Palisades Nuclear Power Plant, as well as the preparation and training of its employees to operate the plant.
The Michigan Public Service Commission, in representing the utility ratepayers of this state, is greatly concerned over the reliability of Michigan electric generating plants. This concern is particularly brought forward by the technical difficulties at the Palisades Nuclear Power Plant of Consumers Power Company, which have interrupted operations over'the past 22 months, includ-ing the entire year beginning in August, 1973. The cost of replacement power for these outages is estimated by Consumers Power to average $5-7 million per month. To date, this cost exceeds $50 million. This has had an obvious dramatic impact on Consumers' financial condition and constitutes a financial burden on its ratepayers. The sum of $300 million mentioned in the suit reflects the company's assessment of the Palisades outage as a major and potentially devastating financial event. It also makes vividly clear the level of financial risk that must be borne if generating facilities fail to perform as expected.
The Michigan Public Service Commission is, of course, aware that Bechtel is also the prime contractor for Consumers Power in the construction of the Midland Nuclear Power Plant. We note further that the Atomic Energy Commission conducted a hearing, beginning in July, 1974, to determine whether sufficient cause existed to halt further construction activity:at the Midland plant. That aring was directed toward resolving the question of whether the MIC 3' DR . ,i , 7 4efd Off. Dir. r* %
%ns n h .I, J
l'
- Chairman Dixie Lee .ay November 8, 1974
- Page 2 Consumers Power quality assurance program complied with AEC regulations and whether there was reasonable assurance that Consumers Power would remain in compliance. The Atomic Safety and Licensing Board ruled in favor of the utility, permitting construction to continue. However, we note, as did the Board, that the Director of Region III, Directorate of Regulatory Operations, AEC, stated that should construction activity deter-iorate, he would not hesitate-"to step in and stop construction...."
We are concerned that the unreliable operation of the Palisades Nuclear Power Plant has raised public concern over the economic consequences of electrical generation in general, and nuclear power generation in particular. With these facts in mind, the Commission respectfully requests you provide us,with answers to
- the following questions: ' -
- 1. As compared with normal AEC procedures, has the AEC taken special precautionary measures to assure adequate construc-tion at Midland Nuclear Power Plant? What changes, if any, have been instituted specifically for Midland because Bechtel is the constructor?
- 2. In light of the Palisades experience, is Bechtel capable of performing its Midland activities in compliance with AEC i l requirements?. l
- 3. Recognizing past concern on the part of AEC, what is AEC's l present opinion with respect to the quality of Consumers Power Company in construction of Midland? ;
- 4. In the opinion of the AEC, will the Midland plant work reliably to provide electric power in an efficient manner to Michigan?
- 5. In light of the Palisades experience, does the AEC believe that contractual agreements are in the public interest which place significant financial burdens resulting from unreliable l
, plant operation on the contracting utility?
- 6. What desirable alternatives are there to shift the cost.of i
unreliable plant operation to the constructors.
In addition to answering these questions at this time, we would I appreciate your outlining arrangements by which we may be kept l informed on a continuing basis. l l
I 1
l l
~ __ , . _ _ , ___ __ _. . . - . . _ . , - _ _ _ . _ - _ - . - - . - _ . . . - , . - - - -
i Chairman 0.ixie Lee ..ay November'8, 1974 Page 3 l
We understand the legal preemption giver. by the Atomic Energy Act to the AEC with respect to safety of nuclear plant design, con- ,
struction, and operation. The AEC must in turn recognize that '
utility ratepayers and investors ultimately can be expected to bear the major financial burden when plants fail to operate.
Michigan ratepayers and utility investors look to the Michigan 1 Public Service Commission for answers to these failures, and for !
assurance that every reasonable effort is being made to prevent future financial problems due to plant operational failures, and for assurance that the financial strength of the utilities will be maintained. This Commission must ask the AEC for assur-ance that nuclear power plants are being designed and constructed not only to high standards of safety, but to high standards of quality and reliability. The AEC, in our opinion, has a major responsibility to assure that the public will receive the bene-fits of an operating plant that will work. The public's need for power at reasonable rates for electric service will be served only by the highest quality and reliability of generating facilities.
No concerns expressed here should be assumed to either support or oppose any matters currently before the AEC.
Your attention to these matters will assist us in carrying out our responsibilities to ratepayers and investors of Michigan utilities, and we will be pleased to receive your early atten-tion and response.
Sincerely, I Y), AW.
a Wi9ffam GT'Rosenb rg, Chairman Lent A. h -
G. Sculta rp Commi ioner 49 _
Nilliam R..RW ls', Commissioner
~
l 1
HQ 206. (4 74) .!
F 3
'oa a '"a a^ " " *"' ' ' ' ' 7'
< ^
75 1630 AEC SECRETARIAT TO: O COMMISSIONER DATE: 11/14 / 7tz O GEN. MANAGER O GEN. COUNSEL O INFO. SERVICES O DIR. P.EGULATION O PLAN.& ANAL. O SECRETARY U
L J INCOMING: William G. Rosenburg. Chairman : Commianinnara FRoM: Lenton G. Sculthrop & William R. Ralls. Dept.
of Commerce, PSC, Lansing. Michigan TO: Chairman Rav DATE:ll/8 /74 SU5 JECT: Reliable operation of the Midland Nucient Pnuar Plant in view of Epchral'a e nn e e ri,r ei nn nf ,- h .
Palisades Nucione Power P1nie
, O PREPARE REPLY FOR SIGNATURE OF: .-
O CHAIRMAN . ,
O COMMISSIONER O cM, OR, GC. PA, IS, SECY O SIGNATURE BLOCK OMITTED D PLE ASE RETURN ORIGINAL WITH RESPONSE D FOR OIRECT REPLY
@ SENO COPY OF REPLY TO:
C SECY MAIL FACILITY (3)
O CHAIRMAN O COMM SsicNERS O SECRETARY O FOR APPROPRIATE ACTION
. O FOR INFORMATION O FOR RECOMMENOATION REMARKS: See SeCy Ticket #75-4600
/7 FOR THE COMMISSION: /W t -
WHEN SEFARATED FROM ENCLOSURES .
7 . - -
HANDLE THIS DOCUMENT AS 'I C ,
ACTION SLIP
,50-329, -330 _., page 2 Anthony-Z. Roisman, Esc.
Natural.Resou'rces Defense Council
~
917 - 15th Street, N.W.
Washington, D.C. 20005 Joseph Gallo, Esq.
Isham, Lincoln & Beale 1050 - 17th Street, N.W.
. Washington, D.C. 20036 David J. Rosso, Esq.
R. Rex Renfrow, III, Esq.
Isham, Lincoln & Beale One First National Bank Plaza Chicago, Illinois 60603 Ms. Mary Sinclair 5711 Summerset Street Midland, Michigan 48640 Mr. Steve Gadler, P.E.
2120 Carter Avenue St. Paul, Minnesota 55108 Grace Dow Memorial Library 1710 West'St. Andrew Road Midland, Michigan 48640 sp, -, -
--r - o- g, p- ~ y- p y w "w- 6' *-- u - - - -