ML19331B079
| ML19331B079 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/09/1973 |
| From: | Vetter W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Thornburg H US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19331B074 | List: |
| References | |
| ALAB-132, NUDOCS 8007250775 | |
| Download: ML19331B079 (1) | |
Text
.-
9'
'19I-[N,;
n UNITCO STATCS b
- d I,
'9.
,i-R ATOMIC ENERGY COMMISSION N (\\, 'v'-
,,o 7
DIRCCTOR ATE OF REGut/. TORY OPCR ATIONS /
W:' ' M, 4 neciON in-700 ROOscytLT ROAD g j,7 v4 GLEN ELLYN. ILLINOIS C0137 s
July 9, l'. 71 U. D. Thornburg, Chief, Inapection & Inforcenent Procedurco trench Directorato of Regulatory Operationo, Headquarterc
!!IDLUG IT.iITO 170.1 MD tiO 2 CONSTRUCTIO:i PISTART STICUS In conjunction with the ett::ched incpection report, no requented on Pcac 19 of !*cnoran:' int and Order (A! AU-132) dated ~une 28,1"73, va have revicued the applicent'c report, dated ::ay 25, 1973, on quality oscurence action being undertchen to accure natinfactory condition to of work already perfornod and natorialo nov onsito purnuant Condition 1 of At!3-106, dated'Itarch 26, 1973, s
Appropriate quality cscurance action is..*qeing taken by Conste.cra Power Conpany and the architect canincer (nechtel Corporation). That is, the procedura.s for inspection. cr.cnination, and tacting included in.
tho appliennt'c repor: cppear to be adequato.
Although evalention techniqueo and corrective cetion to he taken vill i
depend on the reculta of the licennec'c efferer:, we have no rencon to
- orcover, belicyc that futi:re rencdial nction vill bn inadequate.
i bn:cd on the current incpection, vc helieve the vorh io i>cin; donc by qualified perconnel and vill be conpleted in a tinely canner.
j
-l Il.
U E. Vetter, Chief Ecactor Construction Cranch Attachnent:
no Incpection Reports No. 050-329/73-05 and iro. 050-300/73-05 cr-LWA-.Roh:1mc!rnr.
8007250
~7 f
.