Affidavit Re Environ Impacts of Const.Exam of Const on 760804 Revealed That Const Activities Which Impact Upon Site Topography,Flora & Fauna Have Essentially Been Performed. Notices of Appearance of MG Malsch & Ja Axelrad Encl
ML19331A952
Person / Time
Site: Midland
Issue date: 09/07/1976
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19331A948 List:
References
NUDOCS 8007240539
Download: ML19331A952 (7)


Text

,_.

s, 9

UNITED STATES OF AMERICA NUCLEAR REGULATORY C0!CilSS10N BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of C;NSUMERS POWER COMPANY OF MICHIGAN, g g.

Docket Nos. 50-329 Midland, Units 1 and 2) 50-330 AFFIDAVIT OF EDWARD L. JORDAN RE ENVIR02TNTAL IMPACTS OF CONSTRUCTION I, Edward L. Jordan, being first duly sworn, affirm that:

.]

I am the Acting Branch Chief for Construction and Engineering Support of the Nuclear Regulatory Co: mission Region III Office of Inspection and EnforcecNt, which has the responsibility f or inspection of the Consu:ters Power Company of Michigan's Midland Plant, Units 1 and 2.

.' On Auguat 4,1976, I visited the construction site of the Midland Units in Midland, Michfgan. Examination of construction activit.es during the visit, combined with information gathered 4

by our inspection program, show that Unit 1 and Unit 2 were approxir.ately 13 and 16 percent complete, respectively, as of August 6, 1976, as reported in the August 1976 " Construction Status Report" NUREG-0030-7. Specifically, the status is as follows.

a.

?'

preparation is essentially conplete, foundations have ber excavated, roadways have been prepared, earthen dikes ha*.e been constructed, and grades have been established.

I

.orary construction office. a concrete batch plant, and.

f 8007240 f 3 p f

F equipment storage buildings have been erected. At the time of the inspection on August 4,1976, backfill was being placed and compacted around the excavation for the reactor and auxiliary buildings. The river inlet structure is under construction, and an outdoor storage area is being graveled, fenced, and lighted. The steam supply line to Dow Chemical has not been laid.

In sucimary, those construction activities which impact upon the site topography, flora, and fauna have essentially been performed.

b.

The reactor building bases have been poured, and the contain-ment liners have been erected up to the dc=e level for both units. The containment done liner for Unit 2 is presently scheduled to be set during November 1975. Concrete placement I

is utlerway within both reactor buildings.

c. The a 2xiliary building foundation is completed, and erection-of walls and floors is currently in progress. The concrete structure had been erected to an elevation slightly above grade level as of August 4,1976.
d. The Unit 2 turbine base mat and turbine pedestal have been pourc., Unit 1 base mat has been completed, and the turbine pedes.al is under construction.

' e 'n plant safety related cociponents, such as reactor P-pressure vessels, primary recirculation pumps and motors,

s

. motor operated valves, piping, steam generators and pressurizers have been delivered to the site and are stored until installation. ' Unit 2 reactor vessel and steam generator installation is presently scheduled for June 1977, with installation in Unic I scheduled approximately one year

later, f.

The primary construction activities scheduled for the next six months are installation of reinforcement steel and concrete in the reactor, auxiliary, and turbine buildings.

/

'S nd Edward L. Jor S..bscribed and sworn'to by me this N day of bloo 19M.

f

,is,bm J6tary Public

~

~

,,.....,,. ;...=: e.: *:.g> t

. im c

OYO IG-WO3 '131

  • ' I V l'U f.

IP So,

\\

holu;s,.

A801V'Irit _u uy..r',.P.*! Tr; p

- s UNITED STATES OF AMERICA NUCLEAR REGU'.ATORY COMMISSION BEFORE'THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of CONSUMERS POWER COMPANY Docket Nos. 50-329 50-330 (Midland Plant, Units 1 and 2)

NOTICE OF APPEARANCE Notice is hereby given that the undersigned attorney herewith enters an appearance in the captioned matter.

In accordance with 52.713(a),

10 CFR Part 2, the following information is provided:

Name

- Martin G. Malsch Address

- V. S. Nuclear Regulatory Commission Washington, D.C.

20555 Telephone Number

- 301-492-7437

~

Admission

- Supreme Court of Connecticut i

Name of Party

- NRC Staff U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Y'.:

h.h.m Martin G. Malsch Counsel for NRC Staff Dated it B:thesda, Maryland this 2nd dry of September,1976 l

D F

3 l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of CONSU!'ERS POWER COMPANY Docket Nos. 50-329 50-330 (Midland Plant, Units 1 and 2)

NOTICE OF APPEARANCE Notice is hereby given that the undersigned attorney herewith enters an appearance in the captioned matter. Inaccordancewith52.713(a),

10 CFR Part 2, the following information is provided:

Name

- Jane A. Axelrad Address

- U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Telephone Number

- 301-492-7270 Admission

- District of Columbia Court of Appeals Name of Party

- NRC Staff U. S. Nuclear Regulatory Commission i

Washington, D.C.

205b5 h4% 0. $)dl04c Jane A. Axelrad

,JCounsel for NRC Staff Dated at Bethesda, Maryland this 2nd d- ' of September,1976 V

~.

u i

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of CONSUMERS POWER COMPANY Docket Nos. 50-329

)

50-330 (Midland Plant, Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies'of "BRIEF OF THE NRC STAFF IN RESPONSE TO THE BOARD'S AUGUST 18, 1976 ORDER," and " NOTICES OF APPEARANCE" for Martin G. Malsch and Jane A. Axelrad, in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class or air mail, or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 7th day of September,1976:

  • Secreta ry Honorable Vern Miller Atomic Safety and Licensing Attorney General Appeal Panel State of Kansas Statehouse U. S. Nuclear Regulatory Commission Topeka, Kansas 66612 Washington, D. C. 20555 Howard J. Vogel, Esq.
  • Daniel M. Head, Esq., Chairman 2750 Dean Parkway

' Atomic Safety and Licensing Board Minneapolis, Minnesota 55416 Panel U. S. Nuclear Regulatory Commission Dr. Emmeth A. Luebke, Esq.,

Washingtta, D. C. 20555 Member Atomic Safety and Licensing Dr. L Venn Leeds, Jr., Esq.

Board Panel Membe r U. S. Nuclear Regulatory Atomic Safety and Licensing Board Commission Panel Washington, D. C. 20555 10807 Atwell Houston, Texas 77096 Docketing and Service Section Office of the Secretary Myron M cherry, Esq.

U. S. Nuclear Regulatory 1 IBM Pl. a Commission

Chicago, 111nois 60611 Washington, 3. C. 20555 3

~

~~ ^ -

- ^ -

. Harold F. Reis, Esq.

Atomic Safety and Licensing Robert Lowenstein, Esq.

Panel Lowenstein, Newman, Reis & Axelrad U. S. Nuclear Regulatory 4-1025 Connecticut Avenue Comnission Washington, D. C. 20036 Washington, D. C. 20555

~

/

-t' n/

Ye Martin G. Malsch Deputy Chief Regulations Counsel j

A e

f 1

J e

I i

e h

~... _..

..