ML19330C744

From kanterella
Jump to navigation Jump to search
Forwards LER 80-107/03L-0
Date released: 12/10/2019 Download: ML19330C744


LER 80-107/03L-0:on 800719,during Routine Power Ascension, Determined That Method for Verifying Jet Pump Operability Not in Compliance W/Tech Specs.Caused by Inaccurate Method Re Calculating Delta P Variance.Method Revised
ML19330C747
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/04/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330C747 (2)
Forwards LER 80-107/03L-0
ML19330C743
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/04/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330C743 (1)