ML19330C346

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-011/03X-4
Date released: 12/10/2019 Download: ML19330C346


Updated LER 80-011/03X-4:on 800401,based on Piping Sys as- Built Configuration Review Required by IE Bulletin 78-14, Seventeen Hangers Were Declared Inoperable.Hangers Repaired or Modified.Design Change Prepared
ML19330C348
Person / Time
Site: Arkansas Nuclear 
Issue date: 08/04/1980
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19330C348 (2)
Forwards Updated LER 80-011/03X-4
ML19330C345
Person / Time
Site: Arkansas Nuclear 
Issue date: 08/04/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19330C345 (1)