7 s
C p,....... 3
......o
,p..
U b-has W M I
Vnct VressJent, AtsdianJ Project n
s....
f.eneves Of fices. 1945 West Perneal Ftoed, Jackson, %chigen 49201 + 15178 788 0640 July 31, 1980 m
Mr J G Keppler, Regional Director li office of Inspection and Enforcement -
US Nuclear Regulatory Cc==ission Region III 799 Roosevelt Road J
Glen Ellyn, IL 60137
=
E MIDLAND UUCLEAR PLANT UNIT NO 1, DOCKET NO 50-329 UNIT No 2, DOCKET No 50-330-SAFE SHUTDOWN BORATION CAPABILITY.
FILE:
0.h.9 36 UFI: 73*10#01 SERIAL:
8807
References:
S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Decket No 50-330; Safe Shutdown Boraticn Capability;
- 1) Serial Hove-283-79; dated October 21, 1979
- 2) Serial Hove-308-79; dated Dece=ber 6, 1979
- 3) Serial Hove-73-80; dated April 11, 1980 This letter, as were the referenced letters, is an interim 50 55(e) report regarding safe shutdown capability assuming a most restrictive core con-
~ dition and the control rod of highest worth stuck out of the core.
The design criteria and the system details have been reviewed and agreed upon by CPCo, Bechtel and B&W.
Engineering and procurenent activities to date are listed belev:
1.
The system summary descriptien has been reviewed and commented on by CPCo and B&W-2.
Becntel has issued P&ID Drawing M-782, which is currently being re-viewed by CPCo and B&W
- 3. ' An order for two (2) 2300 gallen ASME Section III Class 2 Boric Acid -
Tanks (with redundant heaters) has been placed with Richard Engineering Ccmpany (RECO)
- h. _.'An order has been placed for two (2) ASME Section III Class 2 pumps for recirculatien of the emergency beration tank contents.
Solf System turnover to CPCo is presently scheduled for November 1982.
3 8003060'lY-
/
2 t
Another report, either interim or final, vill be sent en or before October 31, 1980.
s GRE/ch CC Director of Office of Inspection & Enforcemen.
ATT Mr Victor Stello, US?;R. (15) i i