Modification flo. Eight (3)
'()
Supplemental Agreement to Contract No. NRC-04-75-237 SUPPLEMEthTAL AGREEMENT BETWEEN VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY AND THE U.S. NUCLEAR REGULATORY COMMISSION THIS SUPPLEMENTAL AGREEMENT, effective the 16th day of May 1980, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the
" Government"), as represented by the UNITED STATES NUCLEAR REGULATORY COMMISSION (hereinafter referred to as the " Commission"), and VIRGINIA POLYTECHNIC INSTITUTE AND STATE-UNIVERSITY (hereinaf ter referred to as the " Contractor").
WITNESSETH THAT:
WHEREAS, the parties desire to modify Contract No. NRC-04-75-237 as hereinafter provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 1954, as amended.
i NOW, THEREFORE, said contract is hereby modified as follows:
1.
Appendix A, attached to this supplemental agreement and made a part hereof, provides for the research to be performed by the Contractor during the contract period specified therein.
2.
In Article II - The period of Performance, the date "May 15, 1981,"
is substituted for the date "May 15,1980."
3.
In Article III - Consideration, the sum "$495,061.97" is substituted for the sum "$275,061.97. "
8008080.047 m
4,
Modification flo. Eight (8)
Supplcmental Agreement to Contract ?!o. f1RC-04-75-237 Page 2 Ill WITilESS UHEREOF, the parties have executed this document.
UtlI",EDSTATESOfAMERICA"1 BYi Fr [d
.f_t Lv Kellogg VL iiorton, Chief' Research Contracts Branch Division of Contracts U. S. fluclear Regulatory Commission VIRGIflIA POLYTECHilIC ItJSTITUTE AtJD STATE UtlIVERSITY BY:
!? i k
/$' H,' Krebs,' Vice President for Administrati,on (title)
I, Margie W. Thomas
_, certify that I am the (attester)
Clerk to the Board of Visitors of the Contractor named under this
~
(title)
A. H. Krebs who signed this document; that _
(signatory) document on behalf of said Contractor was then Vice President for Administratinn of said Centractor; that this document was duly signed for and on behalf of said Cuntractor b'y authority of its governing body and is within the scope Of its legal powers.
Ill WITtJE55 UHEREOF, I have hereunto affixed my hand and the seal of said Contractor.
Virginia Polytechnic Ins.titute and State University '
(SEAL) e m
h flodification fu. Eight (8)
Supplemental Agre: ment t']
~
Contract flo. f1RC-04-75-237
'/
APPEfiDIX A Contractor:
Virginia Polytechnic Insti.tute and State University for the contract period, May 16, 1980 through May 15, 1981:
Article A-1, RESEARCH TO BE PERFORMED BY THE C0!iTRACTOR The unclassified scope of work under this contract entitled, (a)
" Study of the Pattern and Ages of Post-Metamorphic Faults in the fiorthern Piedmont of Virginia and fiorth Carolina" is as follows:
SCOPE OF PROPOSED THREE-YEAR TECHrilCAL PROGPRI Continue developing a three-dimensional geologic framework of 1.
part of the Central Virginia Seismic Zone in terms of:
a.
Faults b.
Surfaces of appreciable rigidity contrast.
2.
Continue completion of a regional study of'the tectonic framework of Triassic basins in Virginia and the relatinn of this framework to historical seismicity.
3.
Continue compilation and analysis of:
a.
Structures b.
Crustal heterogeneity in elastic properties for Virginia and adjacent areas in florth Carolina.
(b) The Principal Investigator (s) expects to devote the following approximate amount (s) of time to the contract work:
Lynn Glover, III, Eleven percent.(ll%) of his time during academic year.
John K. Costain, Eleven percent (11%) of'liis time during academic year.
Article A-II, WAYS AtlD MEAtiS OF PERFORMAtiCE (a)
Items for which support will be provided as indicated in A-III, below:
1.
Salaries and Wages.............. $87,922.00 2.
Equipment to be purchased or fabrica ted by the Contractor......... $ 6,000.00
_ _, _ = _ _ _ _, _ _ _. _
[,'
flodification tio. Eight (8)
Supplemental Agreement to Contract No. flRC-04-75-237
~,
Appendix A Page 2 HB-IB Character Impact Printer, with-interface, I/O expander, enclosure, for Orogenic Studies Laboratory 6" solid source mass spectrometer ($6,000.00) 3.
Travel:
(i)
Domestic................. $39,500.00 (ii)
Foreign.................$ 4.
Other direct costs including fringe benefits 5.
Indirect costs based on i predetermined rate of fifty-three percent (53%) applicable to salaries and wages.
(b)
Items, if any, significant to the performance of this contract, but excluded from computation of Support Cost and from consideration in proportioning costs:
T0 BE C0f4TRIBUTED BY THE C0t4 TRACTOR IBf4 370 Computer Time................ $ 2,000.00 Extra new indirect cost to be cost shared by VPI & SU
...................... $14,945.00 TOTAL........................ $16,945.00 (c) Time or effort of Principal Investigators including indirect costs and fringe benefits contributed by Contractor, but excluded from computation of Support. Cost and from consideration in proportioning costs:
Lynn Glover, III, Eleven percent (11%) of his time during the academic year.
John K. Costain, Eleven percent (11%) of his time during the academic year.
Article A-III SUPPORT COST The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $220,000.00, the Commission will pay one-hundred percent (100%) of the actual costs of these items incurred during the contract period stated in this Appendix A, subject to the provisions of Article III and Article B-XXVIII.
The estimated flRC Support Cost for the contract period stated in this Appendix A is $220,000.00.
The estimated f1RC Support Cost is funded as follows:
(a)
Estimated unexpended balance from prior periods.... $ (b) liew funds for the current period
............ $220,000.00 (c)
The new funds being added in A-III(b constitute'the basis for advance payments provided under Article B-X.
,