Responds to IE Bulletin 80-17 Re Scram Tests.Requests Extension of Required Unit 3 Outage to 800809.Describes Measures Taken to Insure Control Rod Drive Operability
ML19330C180
Person / Time
Site: Peach Bottom  
Issue date: 07/23/1980
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-17, NUDOCS 8008080041
Download: ML19330C180 (3)


Text

1 b

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101

- JOSEPH W. G ALLAGH ER sLscraic eno"oucv o'n oseanvusur (215)841-50o3 July 23, 1980 Mr. Boyce H.

Grier, Director Office of Inspection and Enforcenent Region I US Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

This is in response to your letter of July 3,

1980, which forwarded IE Bulletin 80-17 and contained a twenty-day time limit from the time of notification for performing scram tests described in the Bulletin.

The twenty-day limit expires at 12:01 a.m.

on July 28, 1980.

Your letter also,covided for an extension of this time if shutdown of a unit would severely impact the power reliability in our area.

Philadelphia Electric Company (PE) as part of the Pennsylvania - New Jersey - Maryland (PJM) power pool has been running all available generating equipment to meet the high power demands in our region.

The high temperatures, which the entire PJM area has been experiencing, have created all time high power demands for PE Company and PJM.

Long range forecasts are such that there is a likelihood that peak power demand could be repeated any time during the remainder of the summer season.

Peach Bottom No. 2 Unit is presently in a refueling outage but is expected back in service by the end of July.

The scram tests on this unit will be completed before startup.

PJM advises that an outage of Peach Bottom No. 3 Unit at this time would severely impact the reliability in this region.

Because of the high power demands likely in this area and the critical location of Peach Bottom for supplying power and vitally needed l

voltage support to the PJM power grid, we are requesting that the i

required outage of No. 3 Unit be extended until the weekend of l

August 9, 1980.

It is expected that No. 2 Unit will be 8008080 MI

c s-

\\ i Q~.

Mr. B oy'es ' H. Grior Pogo 2 generating at full capacity by that time and an outage of No. 3 Unit will be possible without severe effects on the power system.

The following measures have been taken to insure the operability of the Control Rod Drive system.

a)

A surveillance test has been initiated which strokes the scram discharge volume vent and drain valves daily to verify proper operation.

Valve position is verified and recorded in the surveillance log once per shift.

b)

The operability of the three gallon limit switch in the scram discharge instrument volume tank is verified during the daily surveillance test identified in item a.

c)

Procedures have been revised to provide additional instructions to the operators for a failure to scram.

Very truly yours,

^

cc: Mr.

D.

Eisenhut Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, DC 20555 1

y

,-.-n-m y

COMMONWEALTH OF PENNSYLVANIA :

ss.

COUNTY OF PHILADELPHIA J.

W.

Gallagher, being first duly sworn, deposes and says:

That he is Manager of the Elect ric Production Department of Philadelphia Electric Coupany; that he has read the foregoing response to IE Bulletin 80-17 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

& WAW&

G U

Subscribed and sworn to this [ h' day before me of l

G I

L J (Ai Noe 'ry 'Public l

\\

iNotary Public, Phila ZABETH H. 00'T.3 a'

o, My3-xnission Expires Jan. 33,1982