ML19330B276
| ML19330B276 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/01/1980 |
| From: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML19330B273 | List: |
| References | |
| NUDOCS 8007310286 | |
| Download: ML19330B276 (2) | |
Text
.
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101
~
JOHN S. KEMPER vsct PREsaotrer jut. - 11980 i
Mr. Boyce Grier, Director Office of Inspection and Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Subject:
Significant Deficiency Report No. 14 Defective Crimps in Electrical Connectors Limerick Generating Station, Units 1 and 2 CPPR'106, 107 NRC Construction Permit Nos.
Attachments:
a) Letter G.
G. Sherwood (GECo) to 2.
H.
Engelken (USNRC) dated 9/28/79 b) Letter PE-2274, H.
G. DeVoss (GECo) to R.
A.
Muflord (PECO) dated January 10,. 1980 File:
QUAL 2-10-2 (SDR #14)
Dear Mr. Grier:
The attachments have brought to our attention deficiencies in crimped pins associated with the General Electric Power Generation Control Complex (PGCC) being supplied for Limerick Generating Station (LGS).
These deficiencies have been previously reported to the USNRC by General Electric under the provisions of 10CFR, Part 21 (See Attachment a).
The pin cr1mp deficiencies associated with the LGS PGCC were previously evaluated by PECC during April 1979 and, at that time were determined not to be reportable to the USNRC under either 10CFR50.55(e) or 10CFR, Part 21.
That evaluation was made, however, prior to the site inspections of delivered PGCC components at LGS.
The results of the site inspection are contained in attachment 2 and indicate the need for extensive reinspection and repair of crimped pina associated with LGS Unit 2.
We now consider the subject deficiency to be a significant deficiency per 10CFR50.55(e) and are hereby notifying you as required.
l l
4 S 0 07310F(b
/ We believe that the General Electric report submitted under the provisions of.10CFR, Part 21 provides the information required for 10CFR50.55(e) reporting.
Therefore we anticipate chac this letter will be our only report to you on this subject.
We will, of course, assure that defective crimps discovered in the LGS PGCC are corrected in accordance with instructions received from General Electric.
Sincerely
$ f./&-h RJL/gra Copy to:
Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C.
20555
o
. It i lo scle,s,.e s
.r-O u'
q y 4
'. ~GENER AL $ ELECTRIC aucuan ' ong, SYSTEnts DIVlalON Gene 7W, RECTfuC cCNPANY.178 CUfmm ARE. SAN Joes. CALrofMA estas SC 682. (408) 925-5040 LS-148-79 JW W 243-79 k...
September 2Sy, p.
,,..,g..
. la L (*
'b'*1 NOV
... - l -
S.$
'r. 6;pE.l.~:.kR &sh.- hg Mr. Robe,hYf.l.".ihhi'~:'.e*.'
rt-N testr.
'9.
<~
Office on and Enforcement U. 5.
letary.Consission
,.ges g.-
,.g,.
,/
~.
~Y t'i,
' ' * ' '*$h.',
- a't s'.
O s
- ;^.
d.
p',,,,..,,,;'+.'-
SMJECT:'
.' REPORTABLE CONDITICH CONNECTOR PIM CRINPING DEFECTS ON PANEL INSERT l
- l'v;;-
P853-72C
- i. -
, This h.if.v. advise.the IItC of a reportable condition per.10CFR Part 2 e
It wescreported to Mr. Bobby Faulkenberry of your office by Walter H.
D'Ardenne. Manager. Safety Evaluation P rams on September 25,1979.
The defect is in pin crisps in Panel H12-insert 72C~. The defect Attgchp?'-9." '
d.is a wasj to be reportable on September 24,1979.
'd Y ?*;H.
[-
Gi.i '
- .u.Afact.
Jhe
~
General Electric (GE) as the supplier of the subject ins {erts111 info
.W" * ^
(
the util.i. ties affected and advise them of GE's inspection,eed repair
%,hi' '
._.($$.R8.i.. '
(y.6..SherwoodManager A,
' Q(1L4fep $ Licensing Operation GG$: pes /847 r
Attechnent
.,m-,?,mra:&mW'~=7 ^
n
=,"
,.. y, b,,
'--s a
CC:,L$ Gifford f
DUPLICATE DOCUMENT a
,PRC File i
N Entire document previously nder:
J entered into system 1
,,O g o o lo 4 0 37 1
N o.
of pages:
im
.m
,