_ _.. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
b D DA/RYLAND h
[k COOPERAT/VE
- PO BOX 817 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN 54601 (608) 788 4 000 July 18, 1980 In reply, please refer to LAC-7034 DOCKET NO. 50-409 Mr. James G. Keppler Regional Director U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 IE BULLETIN 80 CONTAMINATION OF NONRADIOACTIVE SYSTEM AND RESULTING POTENTIAL FOR UNMONITORED, UNCONTROLLED RELEASE OF RADIOACTIVIT'I TO ENVIRONMENT
Reference:
(1)
NRC Letter, Keppler to Linder, dated May 6, 1980.
(2)
DPC Letter, Linder to Keppler, (LAC-7024) dated July 11, 1980.
Dear Mr. Keppler:
This is to verify that the action specified in our letter (Reference 2) f as required by the DPC response to Item 2 of the subject bulletin i
contained in your letter (Reference 1), was completed on July 14, 1978.
Sampling of the heating boiler for contamination was added to the appropriate Health and Safety Procedure.
If you have any questions regarding this response, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE AibnlLks loh Frank Linder, General Manager FL:GSB:af lh6L 2 i N 800730ogy
_