% con 80m8f5
% Power vhfd company p.,
o.a.r. onic..: 212 w.. uicnia.n aveau.. secw.on, uicnia.a 4emot. Ar a Code S17 788 0550 DO.
U July 25, 1980 Mr Ja=es G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory C-4 saion 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - RESPONSE TO SUPPLEMENT NO 2 TO IE BULLETI'i No 80-17 FAILURE OF 76 0F 185 CONTROL RODS TO FULLY INSERT DURING A SCRAM AT A BWR Consumers Power Company received telephone notification on July 19, 1980 frc=
Region III to perfor= a facility =odification to address the requirements of Supplement No 2, dated July 22, 1980, to IE Bulletin Jo 80-17 (July 3, 1980)
" Failure of 76 of 185 Control Rods to Fully Insert During a Scra at a BWR.".
Consumers Power Company ce=pleted the required modification and provided telephone notification of completion to Mr Frank Reimann, Region III on July 19, 1980. Mr Rebann noted that he had just been informed by the NRC Resident Inspector - Big Rock Point that the modification had been completed and vitnessed by the inspector.
l The modification's purpose was to "... provide an alternate vent path continu-ously open to building atmosphere on the side of the vent valve piping away from
,i the SDV."
This objective was cchieved by re=oving a pipe cap from the stand pipe of the vent drain line to the enclosure dirty su=p, such that there is an unobstructed vent path to the containment building atmosphera.
David ? Hoffman (Signed) k O
David P Hoffman 0
Nuclear Licensing Administrator g
CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforce =ent NRC Resident Inspector - Big Rock Point Plant Attachment 0 0729offf
j e
e CONSUMERS PCWER COMPANY Big Pock Point Plant IE Bulletin 80-17 Supplement No 2 Docket 50-155 i
License DPR-6 At the request of the Commission and pursuant to the Atomic Energy Act of 1954
)
and the Energy Reorganization Act of 197k, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company cubmits our response to Supplement No 2, dated July 22, 1980 to IE Bulletin 80-17, entitled,
" Failure of 76 of 185 Control Rods to Fully Insert During a Scram at a BWR."
)
Consumers Power Company's response is dated July 25, 1980.
CCNSUMERS TNiER COMPANY By R C Youngdahl (Signed)
R C Youngdanl, Executive Vice President Sworn and subscribed to before me this 25th day of July 1980.
I Linda K Carstens (Signed)
Linda K Carstens, Notary Public (SEAL)
Jackson County, Michigan My commission expires June 10, 1981 i