Responds to IE Bulletin 80-08.Problems Re Containment Liner Pentration Weld Do Not Exist at Facility.Design for Primary Piping Typical of ASME Code Configurations.Process Pipe/ Flued Head Assemblies Not Installed
ML19330A817
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/10/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO-1-80-198, IEB-80-08, IEB-80-8, NUDOCS 8007290518
Download: ML19330A817 (2)


Text

f TlD W

f

(.

P W shington Public Power Supply System c'

~7 A JOINT OPERATING AGENCY i -.

5

.,c s'\\

5 N;

P, O Box 968 3000 Gro W AsHINGTON W AY RICHL AND. W ASHINGTON 99352 PHONE t S'09 9 94 6 16 t l July 10, 1980 G0-1-80-198 Docket Nos. 50-460 50-513 Mr. R. H. Engelken, Directer U. S. Nuclear Regulatory Commission Region V 1990 N. California Boulevard Suite 202 Walnut Creek Plaza Walnut Creek, California 94596

Dear f1r. Engelken:

Subject:

WNP-1/4 RESPONSE TO IE BULLETIN 80-08 The subject IE bulletin, entitled " Examination of Containment Liner Penetration Weld," has beeil reviewed for application to our Nuclear Project Numbers 1 and 4 (WNP-1/4).

Our response to the concern raised in Bulletin 80-08 is as follows:

1)

The designs for the primary piping containment penetration to outer sleeve welds are typical of the configurations (a), (c),

(d), ',e), and (f) shown in Figure NE 1120-1 Winter 1975 Addenda to the 1974 ASME B&PV code.

2) a)

The applicable ASME code for installing the pipe / flued head assembly is the 1977 cdition including the Summer 1977 Addenda.

b) 100% radiographic inspection will be specified for the subject welds with the acceptance criteria per ASME B&PV

code, c)

The joint configuration for the attachment field weld of the process pipe / flued head assembly to the containment penetra-tion sleeve utilizes a full penetration J-groove butt weld with E-B inserts or using the open butt technique.

(/g 30-3,

La,

$~

Mh. R. H. Engelken M

Page Two i

The follow.ing materials and thickness ranges are being used.

o SA-333 Grade 6 normalized (.322-1.31 inches thick) o SA-155 Grade KC 60 (.75-1.50 inches thick) d)

The process pipe / flued head assemblies have not been installed.

The installation of the assemblies will start the third 3

quarter of 1980.

We have concluded that problems such as described in IE Bulletin 80-08 do not exist at WNP-l/4.

Very truly yours, i it i

D.L.RENBEpG Assistant Dir ctor, Technology DLR:GCS:bk cc: