ML19330A595

From kanterella
Jump to navigation Jump to search
Forwards LER 80-077/03L-0
Date released: 12/10/2019 Download: ML19330A595


LER 80-077/03L-0:on 800708,during High Reactor Pressure Instrumentation Functional Test & Calibr,Found That Pressure Switch 1B21-NO23B Actuated in Excess of Tech Specs.Caused by Setpoint Drift.Switch Recalibr & Successfully Tested
ML19330A602
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/22/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330A602 (2)
Forwards LER 80-077/03L-0
ML19330A594
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/22/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330A594 (1)