mw UNITID STATES OF /JiERICA NUCLEAR REGULATORY CC'42ISSIO!.
uswis 6-30-80 EEFORF THE ATO'41C SAFETY AND LICENSING BOARD In the ' tatter of THIS DOCUMENT CO
!/etropolitan Edison Compey, "ocket No. 50-289 POOR QUAL.lT)' PAG Three Mile Ikland #1 Restart i
INTFRVENOF LD!IS INTERROGATORIES ON NUREG 0680,C'I-1 Restart Evaluation.
SERF 1 to Licensee:
On Page 7-13 of AM 34 Para 7.3 3.1 "There is no bypass capability arount the filter unit."
Face 7 of Power Henctor Events Vol 2 No 2 scr 80 "This pressurized the ion exchanger and backed up radioactive water into the vent piping.a
'i e lack of a bypass is not investigated in the SER.
cuestion:
h what means is provided to overcome the accident sequence in the Power Reactor Events P.7 vol 2 No 2 !! arch S0snd II *ir 79-21?
E111 this accident sequence harm the vent header and poccibly cause leaks?
4 SEE J1 to GC F.taff: /. newer same question posed above as 33/1 to Licensee.
SdR'2 tb 3RC Staff:
Tace C4-8 (4)" ventilation systen will be codified..."
"(items 3 and 4) will be cc pleted prior to restart.
"(items 1 and 2) willbe installed prior to con =encing first refueling."
Har any more exact scheduling been agreed upon between Nis0 and 7.et Ed than " prior to?"
Cai NRC U aff provide dates or PERT eg t
diagram scheduling rad at this' time?
g Have engineering drawings of these modifications'been app ~ove*
r by NRC staff? Are they available to Intervenor Lewis? M ere?
I Page Number?
(frawings in nestart Report do not give suffirinnt detail (=aterial, welds, installation diagrams and proceedures.))
sed;2 to MET EO:Page 8-32" The Licensee however, has not yet provided leakage measurement procedures to be used in the program."
HowcantheLicenseeestablish".islowAsPractic'ajle"when (D
o>
Licensee does not yet have a program in place to JJ..achieva g
scal?
Give definite goals and timetables in your--axewer-by
4 which the leakage reduction progran kill peut proc'eidT ~ { ~
Will this leaf reduction program attempt to find the cause C D
o g
for the 6f leaks in pipinC and 5 flange leaq.
g sine cua non an 1 valve body leak in LIO 6/10/80 supplemental Response? 5 s /
f/
s
- f%o ocC
)
2 SNR 45 tn Stafft In NRc 6/25/80 Page f Response to Interrogatory 28:
"Ihere was no specific failure mechanisa involved."
I do not understand.
I I could understand;" Failure mechanism is unknown at this time."
I could understand, "Several failure mechanisms were at work."
I do not understand how something can fail unless there is some erplanation f%
for the failure. It sounds to me like a child saying the jar of peanut butter fell out of the refrigerator by itself.
Flease explain what is meant by "There was no specific failure mechanism"?
I t'ho prepared the above answer?
- ny I contact that pcrnon by phone to eliminate this confusion?
SER J4 to !iRC Staff:
thare in the 1;URE3 06S0 is there a requirement to teet and change filter nedia?
How often will the adsorber stage be tested per time period?
( /.55I 3 X 510-1975 Face 13) till all filter media in the gaseous wacte syste= be tested i
and how often?
e.hcre is the requirement to chr.nge filter cedin that does not pace tha testing?
Is there any mention of testing os "ilter nedia in NUEZ3 06507 2 age nu=ber?
f' V ', ).;
i
/
[
- ( ;g
b #A UNITED STATES OF AMERICA "y'
NUCLEAR REGULATORY COMMISSION c.
/
OCOKETED
[k BEFORE THE ATOMIC SAFETY AND LICENSING EOARD USNRC 3
1 JUL 81980 > d Office cf the $s:ttrl 7/
f'
)
D::}.eeg&Ser(,:e In the Matter of
)
4 Erznh p'/
)
METROPOLITAN EDISON
)
4 COMPANY, et al.,
)
Docket No. 50-239
~ ~ ~ ~ ' ~
)
(Restart)
(Three Mile Island
)
Nuclear Station, Unit
)
No. 1)
)
)
CERTIFICATE OF SERVICE I hereby certify that copies "._
l MT.
L E cAs 15
/ A> T E A dv@TO S/ f 5 bb m
A> /2 c ngre d.n W 7~ W Os/ro Secretary of the Commission ATTN:
Chief, Docketing and Service Section U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Ivan iT.
Smith, Esquire Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Ccmmission Washington, D.C.
20555 Dr. WSiter H. Jordan 881 W. Outer Drive j
Oak Ridge, Tennessee 37830 Dr. Linda W. Little 5000 Hermitage Drive Raleiegh, North Carolina 27612 George F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge g )g f h.
1800 "M" Street, N.W.
Washington, D.C.
20006 James Tourtellot.e, Esquire Office of the Executive Legal Director Af I
g y
flk U.S. N'2 clear Regulatory Commissvn
,f g
g g
Washington, D.C.
20555 V
'/
s i
V 2
, D.g g
3
., m.e..n...i.,
u m.c hi
.