Describes Status of Alternate/Dedicated Shutdown Sys as of 800328
ML19329G076
Person / Time
Issue date: 07/10/1980
From: Case E
Office of Nuclear Reactor Regulation
To: Sauter G
NRC COMMISSION (OCM)
References
FOIA-80-303, FRN-45FR36082, RULE-PR-50 NUDOCS 8007110547
Download: ML19329G076 (2)


Text

-

} Le G.!d$id.ik%

~

,KQL

,j.

ALTERNATE / DEDICATED SHUTDOWN SYSTERS

~

' ~

STATUS AS OF RARCH 28, 1980_

j

~ :-:.. -

Total Operating Plants - -

6_8 Fire Protection Reviews Complete (includes A/S)

Browns Ferry Units 1, 2, 3 i

Brunswick 1 & 2 Rancho Seco Alternate Shutdown Staff Review Complete -

2j, Browns Ferry 1, 2, 3 installation complete)

Brunswick 1 & 2 installation complete)

Xewaunee installation complete)

Rancho seco installation complete)

Cooper.

installation complete D.C. Cook 1 & 2 installation complete Ft. St. Vrain installation complete Hatch 1 & 2 installation complete Poiht Beach 1 installation complete Salem 1 installation complete Indian Point 2 & 3 (installation scheduled for 10/80)

Beaver Valley (installation scheduled fo'r 6/80)

Crystal ~ River 3 (installation scheduled for 3/81)

Nine. Mile Point (installation scheduled for 6/81)

Surry 1 & 2 (installation scheduled for 4/80)

North Anna 1 (installation scheduled for 5/8 '

Farley 1 (installation scheduled for 11/8v/

(All required nudifications)

Staff Review of Non-SEP Alternate Shutdown Systems to be completed by

'j July 1980 (Installation expected to be con:pleted by 6/81) - 33 Arkansas 1 & 2 Prairie Island 1 & 2 Oconee 1, 2, 3*

Dresden 3 (to be received as part of Trojan SEP)

Duane Arnold Zion 1 & 2 Millstone 2 Maine Yankee Quad Cities 1 & 2 Fonticello Turkey Point 3 & 4 Peach Bottom 2 & 3 Vermont Yankee Point Beach 1 & 2 Robinson St. Lucie Calvert Cliffs 1 & 2 Fitzpatrick Ft. Calhoun Three Mile Island 1 & 2 Pilgrim

" Dedicated system -- staff review of concept completefschedule for installation June 1981.

f g

8007140647

l r.

2-c.

v -

.9

.. c. _..

Staff review of SEP plant Alternate Shutdown Systems to be completed by August 1980 - H.

Palisades San Onofre 1+

Dresden 2 Dr.esden 1+

Oyster Creek +

Lacrosse +

Millstone 1+

Big Rock Point +

Ginna**

Yankee Rowe**

r e

Haddam Neck +

    • Dedicated system anticipated (Installation expected to be completed 12/82).

+ Alternate shutdown system anticipated (Installation expected to be completed by 12/81).